Filter Search


Asia-Pacific


Location Summary Deadline
India Restoration Of Road Widening Portion From H.no.6-2-787 To Bigboss Hotel On Chintal Basthi Main Road In Khairatabad, Circle-17, Kz, Ghmc (item No.02) 2025-05-02
India Reconstruction Of Damaged Storm Water Drain At 331/c, C-type Quarter, Bk Guda In 100-sanathnagar Ward, Circle-17, Kz, Ghmc (item No.03) 2025-05-02
India Annual Maintenance Of Toilets In Khairatabad Zonal Office In 91-khairatabad Division, Circle-17, Kz, Ghmc (item No.04) 2025-05-02
India Supply And Installation Of Internet For 12 Months (i.e. From April-2025 To March-2026) To Zonal Office Building, Khairatabad, Circle-17, Kz, Ghmc (item No.05) 2025-05-02
India Supply, Delivery, Erection, Testing And Trail Run Of 55kw/75hp 1480 Rpm Horizontal Squirrel Cage Pump Sets, Along With New Starter Control Panel, Cables, Ms Specials, Valves Etc., In Place Of Existing 60 Hp Out Dated Pump Sets At Syednagar Pump House, Mla 2025-05-02
India Maintenance Of Footpath From Puranapul Darwaza To City College Junction, Laying Of Cc Patches At Tshc Gate No.1,2.3, And Painting To Steel Railing And Providing Chainlink Fencing Along Musi River At Puranapul Shamshanghat In Charminar Cir-9, Ghmc 2025-05-02
India Maintenance Of Greenery And Rose Fountain Located At Lakdikapool, Opp: Dwaraka Hotel, Khairtabad, And Pots On Khairtabad Flyover In Circle No. 17, Khairtabad Zone, Ubd, Ghmc For A Period Of 6 Months 2025-05-02
India Supply Of Rectangular Permanent Magnetic Bed And Other Items, Rectangular Permanent Magnetic Bed, Length: 450 Mm (±5mm), Width: 150 Mm(±5mm), Thickness: 70 Mm(±3mm Rectangular Permanent Magnetic Bed, Length: 300 Mm (±5mm), Width: 150 Mm(±5mm), Thickness: 2025-05-02
India Engaging Of Labour-16 No.s And Driver-1 No. Through Outsourcing Agency In L B Nagar Zone (sports Section), Ghmc For The Period From 01.04.2025 To 31.03.2026 . 2025-05-02
India Repairs To Existing Sewer Pipelines And Manholes In Ward No.11 And 12 Of Adibatla Municipality 2025-05-02
Whats app