Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Durga Puja Stage With Bedi And In Front Of Stage Sheet Shed At Ranisayer Sarbojanin Durga Puja Committee, Ward No 33 Under Amc In The District Paschim Bardhaman. 2024-10-21
India Construction Of A.w.c. At Poomong, Poomong Rampuria, Under Rangli Rangliot (centre Code 19327160505) 2024-10-21
India Rectification To The Existing Damaged 263 S Rcc Road By Providing Bt Road From Ash Handling Sub Division Office To Ash Silo 4 And 5 Towards East At Ttps 2024-10-21
India Procurement Of Hydraulic Spares Required For M/s Bemco Make Re- Railing Equipment At Coal Handling Plant -3x660mw, Ktps. 2024-10-21
-Connection-For-Side-Filling-Of-Roof-Water-Tank-To-Drg.-No.--T-6-3-651,-Alt-55/d-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+>India -Connection-For-Side-Filling-Of-Roof-Water-Tank-To-Drg.-No.--T-6-3-651,-Alt-55/d-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+>Supply Of Connection For Side Filling Of Roof Water Tank To Drg. No.- T-6-3-651, Alt-55/d
Connection For Side Filling Of Roof Water Tank To Drg. No.- T-6-3-651, Alt-55/d [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+
-Connection-For-Side-Filling-Of-Roof-Water-Tank-To-Drg.-No.--T-6-3-651,-Alt-55/d-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+>2024-10-21
India Providing And Fixing Roof Top And Fencing Work Of Service Transformers In Various Location At Plant Area At Gsecl Tps. 2024-10-21
qty:657
>India
qty:657
>Supply Of Seal, Switch, Spring, S Shoe, T D Assy, Sensor, Coolant, Switch P, S Assy, Regulator, T Assy, Relay, R Assy, Speedometer
qty:657
qty:657
>2024-10-21
-Construction-Of-Cc-Road-Block-Sandeshkhali-ii-Ced-iii-Sdb-1132m-Core-Plan>India -Construction-Of-Cc-Road-Block-Sandeshkhali-ii-Ced-iii-Sdb-1132m-Core-Plan>Wbsdb/ee/ced-iii/ Niet-09/2024-25/4
Construction Of Cc Road Block Sandeshkhali-ii Ced-iii Sdb 1132m Core Plan
-Construction-Of-Cc-Road-Block-Sandeshkhali-ii-Ced-iii-Sdb-1132m-Core-Plan>2024-10-21
-Interconnection-For-Two-Tubewells-At-Bawali-(zone-5)-And-Raspunja-(zone-10)-For-Arsenic-Affected-Areas-Of-South-24-Pgns-Under-South-24-Paraganas-W/s-Division-i,-P.h.e-Dte.>India -Interconnection-For-Two-Tubewells-At-Bawali-(zone-5)-And-Raspunja-(zone-10)-For-Arsenic-Affected-Areas-Of-South-24-Pgns-Under-South-24-Paraganas-W/s-Division-i,-P.h.e-Dte.>23/5
Interconnection For Two Tubewells At Bawali (zone 5) And Raspunja (zone 10) For Arsenic Affected Areas Of South 24 Pgns Under South 24 Paraganas W/s Division-i, P.h.e Dte.
-Interconnection-For-Two-Tubewells-At-Bawali-(zone-5)-And-Raspunja-(zone-10)-For-Arsenic-Affected-Areas-Of-South-24-Pgns-Under-South-24-Paraganas-W/s-Division-i,-P.h.e-Dte.>2024-10-21
India Supply Of A- Spare Ss Pipe 38 0 Mm Diaod, 2 Mm Thickness Length- 297 Mm Moc- Stainless Steel Suitable For Industrial Use, B- Mullite Tube Length-250 Mm, Od - 50 0 Mm, Id - 40 5 Mm Thickness - 5 Mm, C- Refactory Washer Od - 62 0 Mm, Id - 42 0 Mm, Width - 8 2024-10-21
Whats app