Filter Search


Asia-Pacific


Location Summary Deadline
-Set-Of-Fastener-Consisting-Of-03-Items-As-Per-Annexure-a-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs-]>India -Set-Of-Fastener-Consisting-Of-03-Items-As-Per-Annexure-a-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs-]>Supply Of Set Of Fastener
Set Of Fastener Consisting Of 03 Items As Per Annexure-a [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
-Set-Of-Fastener-Consisting-Of-03-Items-As-Per-Annexure-a-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs-]>2024-10-21
India Supply Of Hiring Of Consultants - Milestone/deliverable Based - Dpr Preparation Works Of Kumbhe Psp 4x250 Mw; Energy (oil, Gas, Power, Renewables); No; Hybrid(as Specified In Scope Of Work) 2024-10-21
India Khana And Hall At Cmho 2024-10-21
-Equalising-Lever-Support-Bracket-To-Drg-No.-Wa/bg-6345-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitte>India -Equalising-Lever-Support-Bracket-To-Drg-No.-Wa/bg-6345-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitte>Supply Of Equalising Lever Support Bracket
Equalising Lever Support Bracket To Drg No. Wa/bg 6345 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitte
-Equalising-Lever-Support-Bracket-To-Drg-No.-Wa/bg-6345-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitte>2024-10-21
India Internal Repairing & Painting Work At Park Street Ps (ground Floor), During The Year 2024-2025 2024-10-21
India Supply Of Construction Material For Village Panchayat Nosharhedi. 2024-10-21
India Construction Of Silt Chamber And Filter Chamber Near Thikra Jagaransangha 2024-10-21
qty:5
>India
qty:5
>Supply Of Blocking Buffer-1, Blocking Buffer-2, Blocking Buffer-3, Dtt, Pcr Master Mix
qty:5
qty:5
>2024-10-21
India Construction Of A Check Dam Across Vasista Nadhi In S.f.no.121 At Chinnamasamudram Village Of Pethanaickenpalayam Taluk Of District. 2024-10-21
India Design, Engineering, Supply Of Materials/ Equipments, Erection, Testing And Commissioning For Replacement Of Old Damaged 132/11 Kv 20 Mva Power Transformer With 132/33 Kv 50 Mva Power Transformer At Gss Hurl (sindri) Of Dvc On Turnkey Basis. 2024-10-21
Whats app