Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Cc-Drain-From-Laltu-K>India -Construction-Of-Cc-Drain-From-Laltu-K>Construction Of Cc Drain From Laltu Karmakar House Towards The House Of Bimal Bhaskar At Sahajadpur Of Sanmatinagar Gp . Under Raghunathganj-ii Block (part No -127) (apas/01/059/127/0002) With Another 1, Sl.no-3
Construction Of Cc Drain From Laltu K
-Construction-Of-Cc-Drain-From-Laltu-K>2025-12-16
-Installation-Of-Solar-Street-Lights-At-18-No-Different-Places-Under-Chandipur-Panchayat-Samity-Under-Apas-Fund-Rs-24996-Per-Unit-For-17-Unit-And-Rs-49992-For-1-Unit>India -Installation-Of-Solar-Street-Lights-At-18-No-Different-Places-Under-Chandipur-Panchayat-Samity-Under-Apas-Fund-Rs-24996-Per-Unit-For-17-Unit-And-Rs-49992-For-1-Unit>Wb/pm/chp/eo/nit_20/25-26(7)
Installation Of Solar Street Lights At 18 No Different Places Under Chandipur Panchayat Samity Under Apas Fund Rs 24996 Per Unit For 17 Unit And Rs 49992 For 1 Unit
-Installation-Of-Solar-Street-Lights-At-18-No-Different-Places-Under-Chandipur-Panchayat-Samity-Under-Apas-Fund-Rs-24996-Per-Unit-For-17-Unit-And-Rs-49992-For-1-Unit>2025-12-16
-Construction-Of-Cover-Drain-From-G>India -Construction-Of-Cover-Drain-From-G>Construction Of Cover Drain From Golab Sk House To Ata Sk House Via Serajul Sk House At 129 No Baganpara Of Sanmatinagar Gp Under Raghunathganj-ii Block (part No -129) (apas/01/059/129/0001) With Another 1, Sl.no-4
Construction Of Cover Drain From G
-Construction-Of-Cover-Drain-From-G>2025-12-16
-Repairing-And-Renovation-Of-Road-By-Cement-Concrete-Work-(1.1.5.3)-From-The-House-Of-Ashtam-Hazra-To-House-Of-Dilip-Ds-At-Cti-Road-Biradingi,-Under-Ward-No-50,-Booth-No-2,-Hmc-(area-225.65m2)>India -Repairing-And-Renovation-Of-Road-By-Cement-Concrete-Work-(1.1.5.3)-From-The-House-Of-Ashtam-Hazra-To-House-Of-Dilip-Ds-At-Cti-Road-Biradingi,-Under-Ward-No-50,-Booth-No-2,-Hmc-(area-225.65m2)>Wb-hmc/nit/ed/18/ee-ii/25-26
Repairing And Renovation Of Road By Cement Concrete Work (1.1.5.3) From The House Of Ashtam Hazra To House Of Dilip Ds At Cti Road Biradingi, Under Ward No-50, Booth No-2, Hmc (area-225.65m2)
-Repairing-And-Renovation-Of-Road-By-Cement-Concrete-Work-(1.1.5.3)-From-The-House-Of-Ashtam-Hazra-To-House-Of-Dilip-Ds-At-Cti-Road-Biradingi,-Under-Ward-No-50,-Booth-No-2,-Hmc-(area-225.65m2)>2025-12-16
-Installation-Of-Solar-Street-Lights-At-20-No-Different-Places-Under-Chandipur-Panchayat-Samity-Under-Apas-Fund-Rs-24996-Per-Unit-For-20-Unit>India -Installation-Of-Solar-Street-Lights-At-20-No-Different-Places-Under-Chandipur-Panchayat-Samity-Under-Apas-Fund-Rs-24996-Per-Unit-For-20-Unit>Wb/pm/chp/eo/nit_20/25-26(8)
Installation Of Solar Street Lights At 20 No Different Places Under Chandipur Panchayat Samity Under Apas Fund Rs 24996 Per Unit For 20 Unit
-Installation-Of-Solar-Street-Lights-At-20-No-Different-Places-Under-Chandipur-Panchayat-Samity-Under-Apas-Fund-Rs-24996-Per-Unit-For-20-Unit>2025-12-16
India Applications Are Invited From Eligible Candidates For The Post Of Registrar On A Contractual Basis With A Consolidated Salary. The Mandatory Qualifications Include A Pg In Science/ Engineering/ Management, Age Below 54 Years As Of 01 Jan 2026, And Being M 2025-12-16
-Construction-Of-Cover-Drain-From-The-House>India -Construction-Of-Cover-Drain-From-The-House>Construction Of Cover Drain From The House Of Mahammad Musha To The Fakirul At 129 No Baganpara Of Sanmatinagar G.p Under Raghunathganj-ii Block (part No -129) (apas/01/059/129/0004) With Another 1, Sl.no-4
Construction Of Cover Drain From The House
-Construction-Of-Cover-Drain-From-The-House>2025-12-16
-Installation-Of-Solar-Street-Lights-At-12-No-Different-Places-Under-Chandipur-Ps-Under-Apas-Fund-Rs-24996-Per-Unit-For-11-Unit-And-Rs-49992-For-01-Unit>India -Installation-Of-Solar-Street-Lights-At-12-No-Different-Places-Under-Chandipur-Ps-Under-Apas-Fund-Rs-24996-Per-Unit-For-11-Unit-And-Rs-49992-For-01-Unit>Wb/pm/chp/eo/nit_20/25-26(9)
Installation Of Solar Street Lights At 12 No Different Places Under Chandipur Ps Under Apas Fund Rs 24996 Per Unit For 11 Unit And Rs 49992 For 01 Unit
-Installation-Of-Solar-Street-Lights-At-12-No-Different-Places-Under-Chandipur-Ps-Under-Apas-Fund-Rs-24996-Per-Unit-For-11-Unit-And-Rs-49992-For-01-Unit>2025-12-16
-Amc-Including-All-Necessary-Spare-Parts-For-Three-Years-Maintenance-Work-Namely-Installation-Of-23-Nos-Of-Solar-Street-Light-At-Different-Places-Of-Ps-No.-128,129-Under-Herampur-G.p>India -Amc-Including-All-Necessary-Spare-Parts-For-Three-Years-Maintenance-Work-Namely-Installation-Of-23-Nos-Of-Solar-Street-Light-At-Different-Places-Of-Ps-No.-128,129-Under-Herampur-G.p>23/r-i/apas/herampur/2025-26
Amc Including All Necessary Spare Parts For Three Years Maintenance Work Namely Installation Of 23 Nos Of Solar Street Light At Different Places Of Ps No. 128,129 Under Herampur G.p
-Amc-Including-All-Necessary-Spare-Parts-For-Three-Years-Maintenance-Work-Namely-Installation-Of-23-Nos-Of-Solar-Street-Light-At-Different-Places-Of-Ps-No.-128,129-Under-Herampur-G.p>2025-12-16
-Surveying,-Soil-Investigation,-Design-And-Supply-Of-All-Materials,-Labour,-T-And-P-Etc.-Complete-Required-For-Construction,-Erection,-Completion,-Testing-And-Co>India -Surveying,-Soil-Investigation,-Design-And-Supply-Of-All-Materials,-Labour,-T-And-P-Etc.-Complete-Required-For-Construction,-Erection,-Completion,-Testing-And-Co>Water Supply And House Connection Scheme Of Extended Area Of Nagar Nigam Ayodhya Phase-2
Surveying, Soil Investigation, Design And Supply Of All Materials, Labour, T And P Etc. Complete Required For Construction, Erection, Completion, Testing And Co
-Surveying,-Soil-Investigation,-Design-And-Supply-Of-All-Materials,-Labour,-T-And-P-Etc.-Complete-Required-For-Construction,-Erection,-Completion,-Testing-And-Co>2025-12-16
Whats app