Filter Search


Asia-Pacific


Location Summary Deadline
India Supply Of Bolt Hex Head With Nut M 20x 90 N 4.8 To Is:1363/02 (parts 1 & 3)-bl [ Warrantyperiod: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] 2024-10-21
India New Inst.of 2 Hp Submersible Pump Near Bandana Mal House At Tilakganj Under Uriasai Gp Within Garhbeta-iii Panchayat Samity 2024-10-21
-Construction-Of-Cc-Road-From-Old-Nh34-To-House-Of-Dalim-Sk-At-Tinpakuria-Under-Tinpakuria-Gp>India -Construction-Of-Cc-Road-From-Old-Nh34-To-House-Of-Dalim-Sk-At-Tinpakuria-Under-Tinpakuria-Gp>Wb/msd/sganj/12/2024-25/10
Construction Of Cc Road From Old Nh34 To House Of Dalim Sk At Tinpakuria Under Tinpakuria Gp
-Construction-Of-Cc-Road-From-Old-Nh34-To-House-Of-Dalim-Sk-At-Tinpakuria-Under-Tinpakuria-Gp>2024-10-21
India Construction Of Restoration Of Road, Pipeline Protection Works And Other Allied Works For Augmentation Of Laying Distribution System To Extend The Benefit Of 100 House Hold In Zone-ii At Joynagar-ii Block Within Mega Surface Water Based Water Supply 2024-10-21
-Construction-Of-Concrete-Road-Bagda-Adibasipara-Under-Bagdah-Gp-Of-Bagdah-Block>India -Construction-Of-Concrete-Road-Bagda-Adibasipara-Under-Bagdah-Gp-Of-Bagdah-Block>N-9/2024-25/n-24/wbsrda Sl15
Construction Of Concrete Road Bagda Adibasipara Under Bagdah Gp Of Bagdah Block
-Construction-Of-Concrete-Road-Bagda-Adibasipara-Under-Bagdah-Gp-Of-Bagdah-Block>2024-10-21
Philippines Const. Of Box Culvert Of Purok 4 Going To New Brgy. Site Of Brgy. Balibayon, Surigao City 2024-10-21
qty:1
>India
qty:1
>Supply Of Online Probing System With Machine Interfacing Proving As Per Annexure-a
qty:1
qty:1
>2024-10-21
-Gauge-Cum-Level-With-Sprit-Level-As-Per-Rdso-Sepc-No.-Tm/58-Dt:-29.06.2001,-Second-Revision-Of-2022-(for-Gauge-Cum-Level)-And-Tm-52-Dt.-24.05.2000-Second-Revision-Of-2022-(for-Sprit-Level)-Make:-Cpe-Or-Simi>India -Gauge-Cum-Level-With-Sprit-Level-As-Per-Rdso-Sepc-No.-Tm/58-Dt:-29.06.2001,-Second-Revision-Of-2022-(for-Gauge-Cum-Level)-And-Tm-52-Dt.-24.05.2000-Second-Revision-Of-2022-(for-Sprit-Level)-Make:-Cpe-Or-Simi>Supply Of Gauge Cum Level With Sprit Level
Gauge Cum Level With Sprit Level As Per Rdso Sepc No. Tm/58 Dt: 29.06.2001, Second Revision Of 2022 (for Gauge Cum Level) And Tm-52 Dt. 24.05.2000 Second Revision Of 2022 (for Sprit Level) Make: Cpe Or Simi
-Gauge-Cum-Level-With-Sprit-Level-As-Per-Rdso-Sepc-No.-Tm/58-Dt:-29.06.2001,-Second-Revision-Of-2022-(for-Gauge-Cum-Level)-And-Tm-52-Dt.-24.05.2000-Second-Revision-Of-2022-(for-Sprit-Level)-Make:-Cpe-Or-Simi>2024-10-21
India Construction Of Bus Depot Under Pm E-bus Sewa. 2024-10-21
India Scheme Of Drilling Bore (by Dr Rig) With Solar Pump To The Tribal Beneficiaries At Various Villages Of Ta. , Dist.. 2024-10-21
Whats app