Filter Search


Asia-Pacific


Location Summary Deadline
-Pivot-Wear-Plate-To-Drg.no.els/kyn/wcam-3/3/m-212-R1-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Pivot-Wear-Plate-To-Drg.no.els/kyn/wcam-3/3/m-212-R1-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Tender Invited For Pivot Wear Plate To Drg.no.els/kyn/wcam-3/3/m-212 R1
Pivot Wear Plate To Drg.no.els/kyn/wcam-3/3/m-212 R1 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Pivot-Wear-Plate-To-Drg.no.els/kyn/wcam-3/3/m-212-R1-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-05-23
India Proposed Miscellaneous Shifting Of Utilities In Connection With Construction Of Railway Over Bridge(rob) At Lc No. Kp-42 (km 60/200 Of Nh 316) On Puri Konark Road Between Stations Malatipatpur - Puri Under Deposit Scheme. 2025-05-23
India Supply, Delivery, Installation Commissioning Of Electro Mechanical Equipments And Allied Works At Gazna W/s Scheme Block- Hanskhali Under Eastern Mechanical Division, P.h.e, Dte. Dist. Nadia. Sm/09571 2025-05-23
-Sinking-Of-Additional-Tube-Well-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Interconnection,-Construction-Of-Pump-House,-Approach-Road-Of-Daulatpur-Piped-Water-Supply-Scheme-Under-Harishchandr>India -Sinking-Of-Additional-Tube-Well-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Interconnection,-Construction-Of-Pump-House,-Approach-Road-Of-Daulatpur-Piped-Water-Supply-Scheme-Under-Harishchandr>Wbphed/ee/md/niet_11 Of 2025-2026, Sl. No. 08
Sinking Of Additional Tube Well Resolve Tail End Pressure Along With Allied Works Like Interconnection, Construction Of Pump House, Approach Road Of Daulatpur Piped Water Supply Scheme Under Harishchandr
-Sinking-Of-Additional-Tube-Well-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Interconnection,-Construction-Of-Pump-House,-Approach-Road-Of-Daulatpur-Piped-Water-Supply-Scheme-Under-Harishchandr>2025-05-23
-Circuit-Braker-Battery-Charger-Input-(pos-No.-100)-Type---Qx3ah8569-20a,-20-A-690-Vac---3-Polig-Abb-Document-No.---Hbtb585552r3043-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][qua>India -Circuit-Braker-Battery-Charger-Input-(pos-No.-100)-Type---Qx3ah8569-20a,-20-A-690-Vac---3-Polig-Abb-Document-No.---Hbtb585552r3043-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][qua>Supply Of Circuit Braker Battery Charger Input
Circuit Braker Battery Charger Input (pos No. 100) Type - Qx3ah8569-20a, 20 A-690 Vac - 3 Polig Abb Document No. - Hbtb585552r3043 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ][qua
-Circuit-Braker-Battery-Charger-Input-(pos-No.-100)-Type---Qx3ah8569-20a,-20-A-690-Vac---3-Polig-Abb-Document-No.---Hbtb585552r3043-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][qua>2025-05-23
New Zealand Tokoroa Intermediate - Block Cm Ile Upgrade 2025-05-23
-Stmc-Work-From-57.979-Kmp>India -Stmc-Work-From-57.979-Kmp>Stmc Work From 57.979 Kmp -telepara More- Of Ah-48 To 106.115 Kmp -pasakha, Bhutan Border- Of Ah-48 Under Construction Division, Special Project, Ah-48, In The District Of Alipurduar In West Bengal During The Year 2024-25.
Stmc Work From 57.979 Kmp
-Stmc-Work-From-57.979-Kmp>2025-05-23
India Supply Of 132kv Isolator Moving Contact For 132kv Sub-station Bilaspur Under Ee (s/s) Dn. Csptcl . 2025-05-23
-Floor-Channel-(stringer-Inner)-For-Boxnhl-Wagon-To-Rdso-Drg.-No.-Wd-08030-s-01,-Alt-2,-Item-6h-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-I>India -Floor-Channel-(stringer-Inner)-For-Boxnhl-Wagon-To-Rdso-Drg.-No.-Wd-08030-s-01,-Alt-2,-Item-6h-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-I>Tender Invited For Floor Channel (stringer Inner) For Boxnh
Floor Channel (stringer Inner) For Boxnhl Wagon To Rdso Drg. No. Wd-08030-s-01, Alt-2, Item-6h [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , I
-Floor-Channel-(stringer-Inner)-For-Boxnhl-Wagon-To-Rdso-Drg.-No.-Wd-08030-s-01,-Alt-2,-Item-6h-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-I>2025-05-23
-Qty-:-1
>India
-Qty-:-1
>Tender Invited For Sports Kit (track Suit T-shirts) For Fit India Movement
Qty : 1
-Qty-:-1
>2025-05-23
Whats app