Filter Search


Asia-Pacific


Location Summary Deadline
India Consulting Services For Preparation Of Detailed Project Report (dpr) For Conducting Energy Audit For Electromechanical Equipments Of Water Distribution Stations, Wtps, Sewage Pumping Stations To Assess The Functioning Of Equipment And To Suggest Suitable 2025-05-30
India Auction Sale Of Property Residential Individual House For Sale In North Lakhimpur North Lakhimpur Sahar 1st Part Revenue Map, Mouza: Lakhimpur. 2025-05-30
India Auction Sale Of Property, Residential Flat For Sale In Gajanan Park Apartment, Nashik Residential Flat No B-11 On 3rd Floor In B Wing Of Gajanan Park Apartment, On Plot No 23+25+27, S No 25/2/3/4/5/6/a, Besides Om Sai Apartment, Opp. Shivtirtha Colony Udy 2025-05-30
India Construction Of Gram-panchayat Office Building At-shiroli(pu) Ta-hatkanangle Dist-kolhapur(fund- Ma.balasaheb Thakare Smurti Matoshri Grampanchayat Bandhani Yojana And 2515-1238 Year 2023-2024 (malmatta No- 2700)lat- 16.735845,long-74.269215 2025-05-30
-Augmentation-Work-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-90.80cum-Per-Hour-And-Of-Blower-Room-And-Allied-Works-Of-Baharal-Zone-i-Piped-Water-Supply-Scheme-At-Ratua-i-Dev.-Block-Under-Mal>India -Augmentation-Work-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-90.80cum-Per-Hour-And-Of-Blower-Room-And-Allied-Works-Of-Baharal-Zone-i-Piped-Water-Supply-Scheme-At-Ratua-i-Dev.-Block-Under-Mal>Wbphed/ee/md/niet_14 Of 2025-2026, Sl.no.13
Augmentation Work Of Iron Elimination Plant (pressure Type) Having Capacity 90.80cum Per Hour And Of Blower Room And Allied Works Of Baharal Zone-i Piped Water Supply Scheme At Ratua-i Dev. Block Under Mal
-Augmentation-Work-Of-Iron-Elimination-Plant-(pressure-Type)-Having-Capacity-90.80cum-Per-Hour-And-Of-Blower-Room-And-Allied-Works-Of-Baharal-Zone-i-Piped-Water-Supply-Scheme-At-Ratua-i-Dev.-Block-Under-Mal>2025-05-30
India Tender Invited For Special Flat Bearing Plates To Rdso's Drawing No. T-6291 & T-6293 (alt-2) And T- 6292 & T-6294 (alt-2) As Shown In Switch Assembly Drg No. Rdso/t-6280 (alt.7) For Sleeper No. 15 &16 Of 1 In 8.5 Of 6400mm Zu-1-60/60a1e1 Thick Web Switch 2025-05-30
Russian Federation Selection Of Organizations With Sufficient Qualifications To Provide Transport Security Services At The Facilities Of Jsc Russian Railways 2025-05-30
-Tender-For-Thz-Ndt-Equipment-For-The-Nde-Of-Low-Density-Materials>India -Tender-For-Thz-Ndt-Equipment-For-The-Nde-Of-Low-Density-Materials>Vssc/purchase Unit Iii (spre)/vs202400685201
Tender For Thz Ndt Equipment For The Nde Of Low Density Materials
-Tender-For-Thz-Ndt-Equipment-For-The-Nde-Of-Low-Density-Materials>2025-05-30
-Dextrose-25%-100-Ml-Bottle-]>India -Dextrose-25%-100-Ml-Bottle-]>Tender Invited For Dextrose
Dextrose 25% 100 Ml Bottle ]
-Dextrose-25%-100-Ml-Bottle-]>2025-05-30
-Sinking-Of-Additional-Source-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Interconnection-And-Laying-Distribution-Pipeline,-Construction-Of-Pump-House,-Construction-Of-Kharba-Piped-Water-Sup>India -Sinking-Of-Additional-Source-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Interconnection-And-Laying-Distribution-Pipeline,-Construction-Of-Pump-House,-Construction-Of-Kharba-Piped-Water-Sup>Wbphed/ee/md/niet_13 Of 2025-2026, Sl. No. 16
Sinking Of Additional Source To Resolve Tail End Pressure Along With Allied Works Like Interconnection And Laying Distribution Pipeline, Construction Of Pump House, Construction Of Kharba Piped Water Sup
-Sinking-Of-Additional-Source-To-Resolve-Tail-End-Pressure-Along-With-Allied-Works-Like-Interconnection-And-Laying-Distribution-Pipeline,-Construction-Of-Pump-House,-Construction-Of-Kharba-Piped-Water-Sup>2025-05-30
Whats app