Filter Search


Asia-Pacific


Location Summary Deadline
Thailand Hired To Make 5,481 Km Of Pvc Insulated Aluminum Cables, Size 25 Sq M. 2024-07-09
-Qty-:-16
>India
-Qty-:-16
>Supply Of Element, Delivery Valve Assy, Delivery Valve Holder, Sealing Kit, O Ring.
Qty : 16
-Qty-:-16
>2024-07-09
-Qty-:-1
>India
-Qty-:-1
>Supply, Installation Commissioning Of Cnc Flame Plasma Cutting Machine As Per Attached Spec
Qty : 1
-Qty-:-1
>2024-07-09
India Sinking Of 3 Nos 300 X200 Mm Dia Tube Well , 210 Mtr. Depth By D.r. Rig Method Using Upvc Pipe (cd) And Upvc Deep Well Screen (rds) At Proposed Tube Well Site Of Purbo Thakuranichawk , Rajhato , Kaknan W/s Scheme Under Arambagh Sub-division. 2024-07-09
-Qty-:-20
>India
-Qty-:-20
>Supply Of Desktop Computers (q2)
Qty : 20
-Qty-:-20
>2024-07-09
India Development Of Solid Waste Processing Plant For Dry & Wet Waste Under City Solid Waste Action Plan (cswap). #gujarati Image 2024-07-09
-(ph.no.47334)-Arm-Sling-All-Sizes,-Unit:-Numbers.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>India -(ph.no.47334)-Arm-Sling-All-Sizes,-Unit:-Numbers.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>Supply Of (ph.no.47334) Arm Sling All Sizes, Unit: Numbers.
(ph.no.47334) Arm Sling All Sizes, Unit: Numbers. [ Warranty Period: 30 Months After The Date Of Delivery ]
-(ph.no.47334)-Arm-Sling-All-Sizes,-Unit:-Numbers.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]>2024-07-09
India Construction Of Road In Narayanpur Hanuman Temple To Khadri Galli At Zone.03, 2024-07-09
India Supply Of Cable Fault Locator. Detailed Specifications As Per Annexure-a. [ Warranty Period: 36 Months After The Date Of Delivery ] 2024-07-09
India Restoration Of Damaged Road In The Different Stretches From Ch 14.10 Km To 16.10 Km Of Amtala Charial Road. 2024-07-09
Whats app