Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Cc Road From The Paka Rasta To Mira Banerjee House, Station Para 2025-12-30
India Auction Sale Of Property Other Land For Sale In Karuvarankundu Village, Nilambur Taluk Malappuram, Malappuram All That Part And Parcel Consists Of Vacant Land Of Total Extent Of About 107.43are (265.42 Cent). (12.13 Are Under Re Sy No:17/2-15, 90.24are Un 2025-12-30
India Non Structure Repairs Using Guniting, Micro Concreting, Ready Mix Plaster Etc, Repair To Vertical Stacks, Removal Of Vegetation Nad Mechanical External Periodical To High Rise Buildings In Md Accn In The Area Of B/r-iii Under Ge (west) Delhi Cantt-10 2025-12-30
India Amrai F P School Repairing, Under Ward No.-12, Booth-18, D.m.c. Area. 2025-12-30
India Single Wagon Test Rig. .#* Single Wagon Test Rig. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-30
-Electrical-Work>India -Electrical-Work>45/edd(k)/2025-26
Electrical Work
-Electrical-Work>2025-12-30
India Estimate For Load Enhancement Additional Load 5600 Kva (over & Above 5250 Kva) Of M/s Vaswani Industries Ltd. Bp No. 1000954 At Village-sondra, Phase-ii, Industrial Area Siltara, Under (o&m) Dn. Siltara. The Work Includes System Strengthening Work Require 2025-12-30
-Repairing-Of-Gourangapur-Awc-65-No-Icds-And-New-Kitchen-At-Gourangapur-Paschim-Under-Pipulberia-I-Gram-Panchayat>India -Repairing-Of-Gourangapur-Awc-65-No-Icds-And-New-Kitchen-At-Gourangapur-Paschim-Under-Pipulberia-I-Gram-Panchayat>18/pipul-1/amphan/sl-2
Repairing Of Gourangapur Awc 65 No Icds And New Kitchen At Gourangapur Paschim Under Pipulberia I Gram Panchayat
-Repairing-Of-Gourangapur-Awc-65-No-Icds-And-New-Kitchen-At-Gourangapur-Paschim-Under-Pipulberia-I-Gram-Panchayat>2025-12-30
-Placing-And-Fitting-Of-Solar-Street-Light-At-Kankrakhuli>India -Placing-And-Fitting-Of-Solar-Street-Light-At-Kankrakhuli>Nit14_sl6
Placing And Fitting Of Solar Street Light At Kankrakhuli
-Placing-And-Fitting-Of-Solar-Street-Light-At-Kankrakhuli>2025-12-30
-Repairing-Of-Road-By-Cement-Concrete-Works-Along-With-Allied-Work-At-Hare-Krishna-Nagar-6th-Bye-Lane,-From-H/o-Of-Munna-Shaw-To-Anupam-Pahari,-Booth-No.-147,-Ac-173,-Dakshin-Howrah,-In-Ward-No.-45-Under-Howrah-Municipal-Cor>India -Repairing-Of-Road-By-Cement-Concrete-Works-Along-With-Allied-Work-At-Hare-Krishna-Nagar-6th-Bye-Lane,-From-H/o-Of-Munna-Shaw-To-Anupam-Pahari,-Booth-No.-147,-Ac-173,-Dakshin-Howrah,-In-Ward-No.-45-Under-Howrah-Municipal-Cor>Tn/08/apas/b-vii/25-26/24
Repairing Of Road By Cement Concrete Works Along With Allied Work At Hare Krishna Nagar 6th Bye Lane, From H/o Of Munna Shaw To Anupam Pahari, Booth No.-147, Ac-173, Dakshin Howrah, In Ward No.-45 Under Howrah Municipal Cor
-Repairing-Of-Road-By-Cement-Concrete-Works-Along-With-Allied-Work-At-Hare-Krishna-Nagar-6th-Bye-Lane,-From-H/o-Of-Munna-Shaw-To-Anupam-Pahari,-Booth-No.-147,-Ac-173,-Dakshin-Howrah,-In-Ward-No.-45-Under-Howrah-Municipal-Cor>2025-12-30
Whats app