Filter Search


Asia-Pacific


Location Summary Deadline
India Rfp For Preparation Of Gis Based Perspective Plan And Master Plan For Kuppam Area Development Authority (kada) Area 2025-05-27
-Procurement-Of-Ro-Water-Purifier-With-Cooler>India -Procurement-Of-Ro-Water-Purifier-With-Cooler>Procurement Of Ro Water Purifier With Cooler
Procurement Of Ro Water Purifier With Cooler
-Procurement-Of-Ro-Water-Purifier-With-Cooler>2025-05-27
India Providing And Laying Interlocking Tile In Swami Ji Street In Ward No. 1 2025-05-27
Japan Led Lighting Full Set 2025-05-27
-Establishment-Operation-Maintenance-And-Management-Of-Fair-Price-Medicine-Shops-Under-Ppp-Mode>India -Establishment-Operation-Maintenance-And-Management-Of-Fair-Price-Medicine-Shops-Under-Ppp-Mode>Establishment Operation Maintenance And Management Of Fair Price Medicine Shops Under Ppp Modeine Shops
Establishment Operation Maintenance And Management Of Fair Price Medicine Shops Under Ppp Mode
-Establishment-Operation-Maintenance-And-Management-Of-Fair-Price-Medicine-Shops-Under-Ppp-Mode>2025-05-27
qty:2498
>India
qty:2498
>Tender Invited For Plate Locking (through Mim Route) For 9mm Pistol Auto
qty:2498
qty:2498
>2025-05-27
Philippines 25fh0055 Basic Infrastructure Program Bip, Multi-purpose Buildings / Facilities To Support Social Services, Construction Of Multi-purpose Building, Brgy. Cabugao, Bato, Catanduanes 2025-05-27
India Protection Work At Waterlogging Stretches At Km14.500 To Km. 17.400 (lhs) And Km. 14.500 To Km. 16.200 (rhs) On 6-lane Uer2 Nh344 M Pkg2 Karala Kanjhawala Road To Najafgarh Nangloi Road Km 15.000 To 28.450 In Delhi On Item Rate (percentage) Basis. 2025-05-27
India Operation And Maintenance Including Routine Maintenance And Incident Management Of Six Lane Panipat-jalandhar Section Of Nh-1 (new Nh-44) From Km 272.000 To Km 387.100 In The State Of Punjab. 2025-05-27
-Supply,-Installation-And-Commissioning-Of-Smoke-Density-Meter>India -Supply,-Installation-And-Commissioning-Of-Smoke-Density-Meter>Smoke Density Meter
Supply, Installation And Commissioning Of Smoke Density Meter
-Supply,-Installation-And-Commissioning-Of-Smoke-Density-Meter>2025-05-27
Whats app