Filter Search


Asia-Pacific


Location Summary Deadline
qty:1
>India
qty:1
>Supply Of Resolver Interface Module, Amci
qty:1
qty:1
>2024-10-15
India Installation Of 7 Mtr. Street Light 8 Nos Different Place. 2024-10-15
qty:78573
>India
qty:78573
>Supply Of Capacitor-1, Capacitor-2, Capacitor-3, Capacitor-4, Capacitor-5, Capacitor-6, Capacitor-7, Capacitor-8, Capacitor-9, Capacitor-10, Capacitor-11, Capacitor-12, Capacitor-13, Capacitor-14, Capacitor-15, Capacitor-16
qty:78573
qty:78573
>2024-10-15
India Supply Of "u"bolt 10 Mm For Safety Sealing As Per Drawing No. Wr/tkd/el/4-bt-009. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] 2024-10-15
Philippines Construction Of Concrete Pathway, Vinzons Pilot High School, Vinzons, Camarines Norte 2024-10-15
India Supply Of Glass Shutter Arrangement For 2'-6" Wide Windows To Icf Drg No.icf/sk-5-4-105, Alt-e/2, And Part Drg.no. Icf/sk- 5-4-106, Alt-h/2, Icf/sk-5-4-144, Alt. A/2, And Icf/sk-5-4-081, Alt.-e/3 Material And Specification Rdso Str No. Rdso/2007/cg 02, Re 2024-10-15
India Construction Of Road By Thin White Toping (t.w.t) Concreting From Jhulelaal Society To Sai Ashish Chs In Airoli Ward. 2024-10-15
India Nit 973 Pmgsy Road Renewal Maintenance Pkg No Cg 23-m-45 District- Gariyaband 2024-10-15
India Bispyribac Sodium 20 Plus Pyrazosulfuron Ethyl 15 Wdg In Bulk 2024-10-15
India Construction And Maintenance Of A 6000 Sq. Box Cricket Stadium In Back Of Fundahar Ground Of Babu Jagjeevan Ram Ward 53 Under The Annual Licence Fees Model For 5 Years The Project Includes A 10x10 Kiosk, A Prefabricated Toilet And Advertising Rights On Tw 2024-10-15
Whats app