Filter Search


Asia-Pacific


Location Summary Deadline
India Supply And Installation Of Trolly .#* Supply And Installation Of Trolly For Loco Side Body Cleaning. As Per Drawing No. Ipte/el/sk-9 0. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-18
India Operation And Maintenance For The Work Of Siddapuram Lift Irrigation Scheme At Stage I And Stage Ii Pump Houses In Nandyal District For The Year 2025-2026 (from 01.08.2025 To 31.07.2026). 2025-08-18
India Tender Invited For Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Thermal Power Plant; Safety Valve Setting And Testin In Boiler; Service Provider##quantity: 1## 2025-08-18
India 1. Estimate For Providing 2 K.w. Dlf Connection To Shri Ramratan S/o Shri Dookalu Ram At Junapara Kumekela Under Pathalgaon D.c. 2025-08-18
India Strengthening Of Road (providing And Laying Bitumen Mastic For G I P Mall And Sector-16a U-turn On M P-2 Road) Noida 2025-08-18
Philippines Other Supplies And Materials Expenses 2025-08-18
India Tender Invited For Laser Scanning Confocal Microscope (lsm) With Automated Live Cell Imaging Platform With Accessories,##quantity: 1## 2025-08-18
India Advance Work And Nursery Raising Taken For Raising Plantation In Nagur Fs No. 319,20 Ha. Anr Mode-ii Of Hiregutti Range During 2025-26 2025-08-18
India Supply Of Casnub 22 Hs Bogie. .#* Supply Of Casnub 22 Hs Bogie For Bcnhl Wagons. Drawing No:- General arrangement As Per Rdso Drg.no: Wd-04078/s-1, Alt.-4 Or Latest, Item No. 01 To 18, Except Ite m No.-4,6,7,8,9, Specification No:-wd-17-casnub-22-hs Bogie 2025-08-18
India Ward No 02 Sahawali Sith Shavdha Garh (shamshan Ghat) Me Dha Sanskar Chabutra, Kamra Nirman Aadi Ka Karye. 2025-08-18
Whats app