Filter Search


Asia-Pacific


Location Summary Deadline
India Mf Vrla Stationary Battery: 12 V, 120ah .#* Maintenance Free Valve Regulated (sealed) Lead Acid Stationary Battery For Railway S&t Ins allations: 12 V, 120ah. Spec: Irs:s-93/96(a) (amd. 1) Or Latest. [ Warranty Period: 30 Months After The Da te Of Deliver 2026-01-05
India Construction Of New Toilets (2 Nos) With Drainage Facilities To The Existing Samayanallur Division Office Building Located At Tneb Samayanallur Campus 2026-01-05
India Implants And Consumable Items For Gastroentrology Dept 2026-01-05
India Two Component Polyurethane Based Matt Anti Graffiti Paint (top Coat) .#* Two Component Polyurethane Based Matt Anti Graffiti Paint (top Coat) To Mdts-118 - Re v.01, Table - 5 With Matt Finish Gloss Value 10-12 At 45 Degree Of Colour Shade Ral Ds-9000 As P 2026-01-05
India Tender Invited For Ac Static Watthour Meters - Energy Meter (v2) As Per Is 13779 (q2)##quantity: 2000## 2026-01-05
India Tender Invited For Whole Wheat Flour (atta) (v2) (defence) (q2) , Dalia For Defence (q3) , Suji For Defence (q3) , Refined Wheat Flour (maida) (v2) (defence) (q2) , Bran For Defence (q3)##quantity: 1191500## 2026-01-05
India Construction Of Cc Road With Piling And Guard Wall Padmalochan Patra To Gp Office, Mouza Bakshitala, Manoharpur, Jl No. 251, 252, Plot No. 516, 586 Under Khangdihi Gp Within Kolaghat Block (length 2.000 Km) 2026-01-05
-Works>India -Works>Construction Of Pcc Road From Krishna Yadav House To Laltu Tailorunder Achra Gram Panchayatps No 91.
Works
-Works>2026-01-05
India Pontoon, Railing Post Aur R.s. Joist Etyadi Ke Fabrication Ke Dauraan Prapt Scrap Ki E-nilami 2026-01-05
-Incomplete-Sewerage-Line-Laying-Work-From-Khasra-Number-322-Towards-Kotda>India -Incomplete-Sewerage-Line-Laying-Work-From-Khasra-Number-322-Towards-Kotda>Work Under Rule 181 In Gp Kamba
Incomplete Sewerage Line Laying Work From Khasra Number 322 Towards Kotda
-Incomplete-Sewerage-Line-Laying-Work-From-Khasra-Number-322-Towards-Kotda>2026-01-05
Whats app