Filter Search


Asia-Pacific


Location Summary Deadline
-Installation-Of-2kw-Off-Grid-Solar-System-In-07-Sites-Of-North-Balaghat-Division>India -Installation-Of-2kw-Off-Grid-Solar-System-In-07-Sites-Of-North-Balaghat-Division>2kw Off Grid Solar System
Installation Of 2kw Off Grid Solar System In 07 Sites Of North Balaghat Division
-Installation-Of-2kw-Off-Grid-Solar-System-In-07-Sites-Of-North-Balaghat-Division>2025-12-17
India Supply Bore Operators/valve Operators , Supplying Tanker Labor With Tankers Coming From The Central Workshop And Supplying Chlorine From Dudheshwar Water Works In Different Areas Of Urban And Rural Areas In Maktampura Ward Of South West (arc) 2025-12-17
India Imp. Of Road With Interlocking Tiles From New Purwa In Ram Kumar House To Ajay Pal House In Ward 14 Zone 03 2025-12-17
India Imp. Of Footpath From Damodar Nagar In Patel Sadan Park To Jagrani Bhawan In Ward 65 Zone 03 2025-12-17
India Imp. Of Internal Lane From Ram Bharos House To Sakil House Infront To Anil Trivedi House In Ward 80 Zone 03 2025-12-17
India P/f New Footpath And Repairing Footpath At Different Place Regarding Swachchh Bharat Mission In Maktampura Ward Of South West Zone (arc) 2025-12-17
India Imp. Of C.c. Road From Khatikana And Pasiyana In Ward 80 Zone 03 2025-12-17
India P/f New Footpath And Repairing Footpath At Different Place In Maktampura Ward Of South West Zone (arc)(year 26-27) 2025-12-17
India Discharge/earthing Rod Assembly .#* Discharge/earthing Rod Assembly, Spec: Eti-ohe-51(9-87) With A C Slip No. 1, Str: Core-str-12a [ Warranty period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total 2025-12-17
India Tubular Crimping Socket For 150 Sq. Mm .#* Tubular Crimping Socket For 150 Sq. Mm E Beam Cable, As Per Rcf Spec. Edts 200, Rev-0, A m-2, Corr-1,2,3, Item-1. Note: - Firm Shall Be Submit Oem/autorised Dealer Certificate Along With Offer. [ W arranty Period 2025-12-17
Whats app