Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Cc Road From Bablu Murmu To Dipan Ghoshs House 60 Mtrs Mouzakutub Sahar Jl. 32 2026-01-02
India Renovation Of Cc Road Dhudhutti Mritunjoy Pore House To Dhudhutti Playground 2026-01-02
-Construction-Of-Gurung-Basty-Market-At-Gurung-Basty,-W.no-03(8th-Call)>India -Construction-Of-Gurung-Basty-Market-At-Gurung-Basty,-W.no-03(8th-Call)>(04)24/wbmad/smc/pw/25-26
Construction Of Gurung Basty Market At Gurung Basty, W.no-03(8th Call)
-Construction-Of-Gurung-Basty-Market-At-Gurung-Basty,-W.no-03(8th-Call)>2026-01-02
India Tender Invited For Portable Fire Extinguishers (v3) Isi Marked To Is 15683 (q2)##quantity: 1034## 2026-01-02
India Ward No. 43 Karim Nagar Colony, Amba Vihar, Rampuram Aadi Vibhin Sthano Par Nali, Puliya Chanal Evam Sadak Marmmat Ka Karya 2026-01-02
India Brake Cylinder .#* Brake Cylinder Pbac 254-130 To Ftrtipl Part No. 4f-125156 For Lhb Coaches, Conforming To Rdso Specification no. Rdso/2011/cg-04, Rev.04. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-02
India Procurement Of Led Fittings For Ytps On Arc Basis For 2 Years .#* Item Names: Led Lights 15 W., Led Tube Light Fitting 39 Watts., Led Panel Luminary 42w., Led Bay Light Fitting 40w, Led Bay Light Fitting 60w, Led Sreet Light Fitting 60watts, Led High Bay 2026-01-02
India Auction Of Immovable Property Located At Mr. Kailash Nishad. R.s. No. 50, Its Block No. 84 Plot No 78, As Per Kjp Block No. 84/78, As Per Passing Plan Adm. 40.18 Sq Mtrs, Along With Undivided Share Of Road And C.o.p Adm 25.68 Sq Mtrs Of The Society Known 2026-01-02
India Supply And Laying Of Different Types Of Cables Etc. .#* Supply And Laying Of 4 X 50 Sq. Mm, Xlpe Insulated, 1100 Volts Grade, Lt Cable With Improve d Fire Performance Category C2, Stranded Aluminum Conductor Complying With Class 2 Of Is 8130, Cores La id 2026-01-02
-In-Ward-No.-7,-Near-Jharna-Basti,-Under-The-Railway-Bridge,-We-Have-The-Work-Of-Laying-Pipes.>India -In-Ward-No.-7,-Near-Jharna-Basti,-Under-The-Railway-Bridge,-We-Have-The-Work-Of-Laying-Pipes.>Lot-01 (15th Vitta A)
In Ward No.-7, Near Jharna Basti, Under The Railway Bridge, We Have The Work Of Laying Pipes.
-In-Ward-No.-7,-Near-Jharna-Basti,-Under-The-Railway-Bridge,-We-Have-The-Work-Of-Laying-Pipes.>2026-01-02
Whats app