Filter Search


Asia-Pacific


Location Summary Deadline
India S/r Of 4 Nos. L/r (i) Garhi Bajidpur To Berka (id No. 9366), (ii) Padheni To Kaliaki Id No. 5674), (iii) Ranika To Naharpur (id No. 1240), (iv)dawala Dhani To Modhpur Ahir (id No. 1246) In Sohna Constituency, Distt. Gurugram Under Work Plan 2025-26 2025-05-01
>India >Selection Of Contractor To Implement Swm Services Pertaining To D To D Collection Transportation, Disposal Of Waste To Nearest Ulb Processing Units In An Environmentally Compliant Manner Along With Roads Sweeping, Drain Cleaning Green Area Cleaning
>2025-05-01
-Updation-Of-Far,-Segregation-Of-Annual-Accounts-In-To-Retail-Distribution,-Audit-Filling-Of-Income-Tax-Return-Of-Dhbvn-Pf-Trust,-Audit-Filling-Of-Income-Tax-Retur>India -Updation-Of-Far,-Segregation-Of-Annual-Accounts-In-To-Retail-Distribution,-Audit-Filling-Of-Income-Tax-Return-Of-Dhbvn-Pf-Trust,-Audit-Filling-Of-Income-Tax-Retur>Annual Accounts In To Retail Distribution, Audit Filling Of Income Tax Return Of Dhbvn
Updation Of Far, Segregation Of Annual Accounts In To Retail Distribution, Audit Filling Of Income Tax Return Of Dhbvn Pf Trust, Audit Filling Of Income Tax Retur
-Updation-Of-Far,-Segregation-Of-Annual-Accounts-In-To-Retail-Distribution,-Audit-Filling-Of-Income-Tax-Return-Of-Dhbvn-Pf-Trust,-Audit-Filling-Of-Income-Tax-Retur>2025-05-01
>India >Selection Of Contractor To Implement Swm Services Pertaining To D To D Collection Transportation, Disposal Of Waste To Nearest Ulb Processing Units In An Environmentally Compliant Manner Along With Roads Sweeping, Drain Cleaning Green Area Cleaning
>2025-05-01
India Const Of Boundary Wall (balance Work) In Office Building In Sector 12 Ue Karnal 2025-05-01
-Blocking-Diode-(vs-Diode)10-Amps.-As-Per-Clw-Specification-No.clw/es/d-2-Or-Latest-And-Confirming-To-Clw-Drawing-No.-Clw/es/sk-1/d-1/b.or-Latest.-[-Warranty-Period:-30-Mo>India -Blocking-Diode-(vs-Diode)10-Amps.-As-Per-Clw-Specification-No.clw/es/d-2-Or-Latest-And-Confirming-To-Clw-Drawing-No.-Clw/es/sk-1/d-1/b.or-Latest.-[-Warranty-Period:-30-Mo>Tender Invited For Blocking Diode (vs Diode)10 Amps. As Per Clw Specification.
Blocking Diode (vs Diode)10 Amps. As Per Clw Specification No.clw/es/d-2 Or Latest And Confirming To Clw Drawing No. Clw/es/sk-1/d-1/b.or Latest. [ Warranty Period: 30 Mo
-Blocking-Diode-(vs-Diode)10-Amps.-As-Per-Clw-Specification-No.clw/es/d-2-Or-Latest-And-Confirming-To-Clw-Drawing-No.-Clw/es/sk-1/d-1/b.or-Latest.-[-Warranty-Period:-30-Mo>2025-05-01
-A/r-And-M/o-To-Bhojnagar-Chakki-Mour-Road-In-Km.-0/00-To-14/00.(sh-Repair-To-Pot-Holes-And-P/l-G-iii-Essential-Reaches-In-Km.-2/00-To-10/00)-3rd-Call>India -A/r-And-M/o-To-Bhojnagar-Chakki-Mour-Road-In-Km.-0/00-To-14/00.(sh-Repair-To-Pot-Holes-And-P/l-G-iii-Essential-Reaches-In-Km.-2/00-To-10/00)-3rd-Call>A/r And M/o To Bhojnagar Chakki Mour Road In Km. 0/00 To 14/00
A/r And M/o To Bhojnagar Chakki Mour Road In Km. 0/00 To 14/00.(sh Repair To Pot Holes And P/l G-iii Essential Reaches In Km. 2/00 To 10/00) 3rd Call
-A/r-And-M/o-To-Bhojnagar-Chakki-Mour-Road-In-Km.-0/00-To-14/00.(sh-Repair-To-Pot-Holes-And-P/l-G-iii-Essential-Reaches-In-Km.-2/00-To-10/00)-3rd-Call>2025-05-01
India Shifting Of Ht/lt Poles And Lines In Sector-7, 11, 17, 21 And Sector-4 Mdc And 6 Mdc Panchkula. (including One Year Free Mtc./ Defect Liability Period Free Of Cost) 2025-05-01
India Dismantlement And Re-erection Of 1 No. 12.5 Mtr. Long High Mast And 1 No. 20 Mtr. Long High Mast And Other Allied Works In Sec-4 T/nagar U/e Karnal. (including One Year Free Mtc./ Defect Liability Period Free Of Cost). 2025-05-01
India Providing 45 Watt Led Street Lights On Exitsing Pcc Pole Insector-5 And 16 U/e Karnal. (including Three Years Free Mtc./ Defect Liability Period Free Of Cost). 2025-05-01
Whats app