Filter Search


Asia-Pacific


Location Summary Deadline
India Paper Duplicating Semi Absorbent 21 X 29.7 Cm, 75gsm, 2.3kg Per Ream Of 500shts. Is No-1848/18 Or Latest Amendment. The Paper Must Conform To Para 4.8.2 Of Is 1848. Packing 500shts In A Packet And Maximum 16 To 18 Packets In A Gunny Bag. [ Warranty Period 2025-05-26
India Supply Of Hp Gas 14 Kgs, 200 Grams 2025-05-26
India Auction Sale Of Property Other Land For Sale In Kollam All That Part And Parcel Of The Land Admeasuring 40.28 Ares ( 99.49 Cents ) In Resyno 474/18-1 In Block No 1 Of Puthoor Village , Kottarakkara Taluk , Kollam District 2025-05-26
-Tough-Laminated-Clear-Glass-Panel-For-Rear-And-Front-Sliding-Sash-Assembly-(-Cab-1-&-Cab-2)-For-Hhp-Loco,drg-No.-Dsl/ldh/m-754-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Tough-Laminated-Clear-Glass-Panel-For-Rear-And-Front-Sliding-Sash-Assembly-(-Cab-1-&-Cab-2)-For-Hhp-Loco,drg-No.-Dsl/ldh/m-754-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Tender Invited For Glass Panel
Tough Laminated Clear Glass Panel For Rear And Front Sliding Sash Assembly ( Cab-1 & Cab-2) For Hhp Loco,drg No. Dsl/ldh/m-754 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Tough-Laminated-Clear-Glass-Panel-For-Rear-And-Front-Sliding-Sash-Assembly-(-Cab-1-&-Cab-2)-For-Hhp-Loco,drg-No.-Dsl/ldh/m-754-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-05-26
-Test-Bench-For-Testing-Of-Cut-Off-Angle-Cock,-Dirt-Collector,-Isolating-Cock,-Check-Valve-(consisting-Of-1-No.-Each)-As-Per-Attached-Specification.-[-Warranty-Period:-30-Months-After-Th>India -Test-Bench-For-Testing-Of-Cut-Off-Angle-Cock,-Dirt-Collector,-Isolating-Cock,-Check-Valve-(consisting-Of-1-No.-Each)-As-Per-Attached-Specification.-[-Warranty-Period:-30-Months-After-Th>Tender Invited For Test Bench For Testing Of Cut Off Angle Cock
Test Bench For Testing Of Cut Off Angle Cock, Dirt Collector, Isolating Cock, Check Valve (consisting Of 1 No. Each) As Per Attached Specification. [ Warranty Period: 30 Months After Th
-Test-Bench-For-Testing-Of-Cut-Off-Angle-Cock,-Dirt-Collector,-Isolating-Cock,-Check-Valve-(consisting-Of-1-No.-Each)-As-Per-Attached-Specification.-[-Warranty-Period:-30-Months-After-Th>2025-05-26
-Led-Berth-Reading-Light-(longitudinal)--type-f1(2w)-As-Per-Rcf-Drawing-No.-Lw-76093-Alt-'a'-For-Lhb-Coaches-Conforming-To-Rdso-Specification-No.-Rdso/pe/spec/tl/0091-2016-(rev.1),-Rcf-Annexur>India -Led-Berth-Reading-Light-(longitudinal)--type-f1(2w)-As-Per-Rcf-Drawing-No.-Lw-76093-Alt-'a'-For-Lhb-Coaches-Conforming-To-Rdso-Specification-No.-Rdso/pe/spec/tl/0091-2016-(rev.1),-Rcf-Annexur>Tender Invited For Led Berth Reading Light (longitudinal)
Led Berth Reading Light (longitudinal) -type-f1(2w) As Per Rcf Drawing No. Lw 76093 Alt 'a' For Lhb Coaches Conforming To Rdso Specification No. Rdso/pe/spec/tl/0091-2016 (rev.1), Rcf Annexur
-Led-Berth-Reading-Light-(longitudinal)--type-f1(2w)-As-Per-Rcf-Drawing-No.-Lw-76093-Alt-'a'-For-Lhb-Coaches-Conforming-To-Rdso-Specification-No.-Rdso/pe/spec/tl/0091-2016-(rev.1),-Rcf-Annexur>2025-05-26
-Brake-Controller-Kbi-Part-No.774902-Spec.-Knorr-bremse-Part-No.-774902-For-Ccb-1.5-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Brake-Controller-Kbi-Part-No.774902-Spec.-Knorr-bremse-Part-No.-774902-For-Ccb-1.5-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Brake Controller Kbi Part No.774902 Spec. Knorr-bremse Part No. 774902 For Ccb-1.5
Brake Controller Kbi Part No.774902 Spec. Knorr-bremse Part No. 774902 For Ccb-1.5 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Brake-Controller-Kbi-Part-No.774902-Spec.-Knorr-bremse-Part-No.-774902-For-Ccb-1.5-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-05-26
Vietnam Provision Of Downhole Completion Equipment Of Thien Ung Field - Block 04-3 Provision Of Downhole Completion Equipment Of Thien Ung Field - Block 04-3 (25-vt-1121/25-kt), Ms. Qu?nh, Email: Quynhvn.hq@vietsov.com.vn 2025-05-26
India Assistance And Management In Coal Feeding From A Chp To Conveyor K-10 Including Mesh Of K-10 At Conveyor 17 Of Btps, Obra Tps 2025-05-26
Thailand Feasibility Study: A Smart Hybrid Aerator And Air Quality Management In Thailand 2025-05-26
Whats app