Filter Search


Asia-Pacific


Location Summary Deadline
-Pressure-Switch-[part-No:--64.07.1000.163]-Make:--Soyuz,-Plasser.-[-Warranty-Period:-6-Months-After-The-Date-Of-Delivery-]-]>India -Pressure-Switch-[part-No:--64.07.1000.163]-Make:--Soyuz,-Plasser.-[-Warranty-Period:-6-Months-After-The-Date-Of-Delivery-]-]>Tender Invited For Pressure Switch
Pressure Switch [part No:- 64.07.1000.163] Make:- Soyuz, Plasser. [ Warranty Period: 6 Months After The Date Of Delivery ] ]
-Pressure-Switch-[part-No:--64.07.1000.163]-Make:--Soyuz,-Plasser.-[-Warranty-Period:-6-Months-After-The-Date-Of-Delivery-]-]>2025-06-02
-Laying-Balance-Pipe-Line-For-Providing-Fhtc-And-Other-Ancillary-Work-At-Borakamalpur-Zone-1-Water-Supply-Scheme-Under-Chandannagar-Sub-division-Of-Hooghly-Division-P.h.e-Dte.>India -Laying-Balance-Pipe-Line-For-Providing-Fhtc-And-Other-Ancillary-Work-At-Borakamalpur-Zone-1-Water-Supply-Scheme-Under-Chandannagar-Sub-division-Of-Hooghly-Division-P.h.e-Dte.>Wbphe/ee/10/hug/2025-26, Sl-18
Laying Balance Pipe Line For Providing Fhtc And Other Ancillary Work At Borakamalpur Zone-1 Water Supply Scheme Under Chandannagar Sub-division Of Hooghly Division P.h.e Dte.
-Laying-Balance-Pipe-Line-For-Providing-Fhtc-And-Other-Ancillary-Work-At-Borakamalpur-Zone-1-Water-Supply-Scheme-Under-Chandannagar-Sub-division-Of-Hooghly-Division-P.h.e-Dte.>2025-06-02
-Qty-:-1
>India
-Qty-:-1
>Tender Invited For Supply Of Armoured Cables At Wai Lpg Plant
Qty : 1
-Qty-:-1
>2025-06-02
India Providing, Supplying, Lowering, Laying And Jointing Of Pvc Pipe Line At Lakhpat Hw To Tri Murti Sump To Haraminala 1175 Bop And Construction Of Under Ground Sump And Pump House & Supply Of Pumping Machinery, Ta. - Lakhpat 2025-06-02
-203.2-Mm-X-95.25-Mm-Brake-Cylinder-With-Slack-Adjuster-Complete-(working-Stroke:-32-Mm)-For-Self-Genera>India -203.2-Mm-X-95.25-Mm-Brake-Cylinder-With-Slack-Adjuster-Complete-(working-Stroke:-32-Mm)-For-Self-Genera>Tender Invited For 203.2 Mm X 95.25 Mm Brake Cylinder With Slack Adjuster Complete (working Stroke: 32 Mm) For Self Generating Main Line Coaches.
203.2 Mm X 95.25 Mm Brake Cylinder With Slack Adjuster Complete (working Stroke: 32 Mm) For Self Genera
-203.2-Mm-X-95.25-Mm-Brake-Cylinder-With-Slack-Adjuster-Complete-(working-Stroke:-32-Mm)-For-Self-Genera>2025-06-02
India Supply Of Dental Equipments, Psp Dental Imaging System With Imaging Plates Gr. 3, 3d Intraoral Scanner System With Accessories Intraoral Scanner. 2025-06-02
-Covering-Of-Slab-Opening-Of-Machine-House-At-Above-6-Meter-Level>India -Covering-Of-Slab-Opening-Of-Machine-House-At-Above-6-Meter-Level>Covering Of Slab Opening Of Machine House
Covering Of Slab Opening Of Machine House At Above 6 Meter Level
-Covering-Of-Slab-Opening-Of-Machine-House-At-Above-6-Meter-Level>2025-06-02
-Filter-Element-(bcep/mrep)-To-Kbi-Pt.-No.-Ii104064-(old-P.no.775081)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variat>India -Filter-Element-(bcep/mrep)-To-Kbi-Pt.-No.-Ii104064-(old-P.no.775081)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variat>Tender Invited For Filter For Mr-ii Line
Filter Element (bcep/mrep) To Kbi Pt. No. Ii104064 (old P.no.775081) [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variat
-Filter-Element-(bcep/mrep)-To-Kbi-Pt.-No.-Ii104064-(old-P.no.775081)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variat>2025-06-02
-Emergent-Patch-Repairing-Work-In-Various-Stretches-From-1.00kmp-To-1.475km,-1.725km-To-2.20km,-2.50-Km-To-3.25-Km,-9.50-Km-To-10.50-Km,-10.7-To-11.35-Km-And-Thorough-Surfacing-At-1.475km-To-1.625km,-2.20km-To-2.325-Km,-3.>India -Emergent-Patch-Repairing-Work-In-Various-Stretches-From-1.00kmp-To-1.475km,-1.725km-To-2.20km,-2.50-Km-To-3.25-Km,-9.50-Km-To-10.50-Km,-10.7-To-11.35-Km-And-Thorough-Surfacing-At-1.475km-To-1.625km,-2.20km-To-2.325-Km,-3.>Wbpwd/ee/hhd-i/nit-02/sl-02
Emergent Patch Repairing Work In Various Stretches From 1.00kmp To 1.475km, 1.725km To 2.20km, 2.50 Km To 3.25 Km, 9.50 Km To 10.50 Km, 10.7 To 11.35 Km And Thorough Surfacing At 1.475km To 1.625km, 2.20km To 2.325 Km, 3.
-Emergent-Patch-Repairing-Work-In-Various-Stretches-From-1.00kmp-To-1.475km,-1.725km-To-2.20km,-2.50-Km-To-3.25-Km,-9.50-Km-To-10.50-Km,-10.7-To-11.35-Km-And-Thorough-Surfacing-At-1.475km-To-1.625km,-2.20km-To-2.325-Km,-3.>2025-06-02
India Development Of Shahid Karnal Viplav Tripathi Stadium (mini Stadium). 2025-06-02
Whats app