Filter Search


Asia-Pacific


Location Summary Deadline
India Re Railing Ramps .#* Supply Of Re Railing Ramps Left And Right (each Set 01 Left And 01 Right), As Per Attached Sket ch No. 1899 And Specifications, For Art/asr And Art/fzr [ Warranty Period: 30 Months After The Date Of delivery ] ] 2026-01-02
India Electrical Work For Construction Of New 08 Units Type Ii Qtrs In Lieu Of Condemned 08 units Type I Qtrs No. Ds/1/44/a To H At Hatia Railway Settlement Estimate No 44 rnc 24 2026-01-02
India Internal Supply And Installation Of Solar Street Light At Sukna-panighatta Samasty, Under Kurseong Electrical Engineering Division, Kurseong, Gta. 2026-01-02
India Replacement Of Structural Steel And Deck Plates At The Bina Deshaling Plant 2026-01-02
Hong Kong Design And Construction Of Refurbishment, Modification And Upgrading Works To The Existing Sha tin Transfer Station (stts) 2026-01-02
India Installation Of Paving Blocks And Other Works In The Big Khermai Temple Premises At Bhantalaiya. (adhykash Anushansa) 2026-01-02
India Supplying Materials For Construction Of Cc Drain Siddappa House To Hosakote Nagaraj House Shivapura Village .#* Item Names: Bd1a-portland Cement, Bd1a-coarse Sand (zone Iii), Bd1a-granite Metal 40 Mm, Bd1a-granite Metal 20 Mm, Bd1a-broken Granite Metal 10 2026-01-02
India Extension Of 11/33 Kv/lt Line & Other Work Under City Construction Dn. Raipur. The Work Includes Survey, Supply, Erection, Testing & Commissioning Of Material/equipments, Lines, Sub-station Etc. 30 Kw Ndlf Connection, 70 Kw Dlf Connection, Load Enhancemen 2026-01-02
India Installation Of Solar High Mast Light At Bharatpur Utar Para Masjid 2026-01-02
India Tender Invited For Custom Bid For Services - Third Party Lmi Audit At Nspcl Durgapur Pp2 .#* Energy Audit Service - Lumpsum Based##quantity: 1## 2026-01-02
Whats app