Filter Search


Asia-Pacific


Location Summary Deadline
India Work 64 Np Kerakat Ward 09 Construction Of Interlocking Puliya To Chauhan Basti 2025-06-02
qty:4
>India
qty:4
>Tender Invited For Trunion For Disc Filter A B (drive Safe) As Per Drg No Uci- M-523/a, Rev-1 Attached, Trunion For Disc Filter A B (drive Safe) As Per Drg No Uci-m-628/a, Rev-1 Attached
qty:4
qty:4
>2025-06-02
-Supply,-Installation,-Testing-And-Commissioning-Of-Electrical-Systems-As-A-Part-Of-Finish>India -Supply,-Installation,-Testing-And-Commissioning-Of-Electrical-Systems-As-A-Part-Of-Finish>Supply, Installation, Testing And Commissioning Of Electrical Systems As A Part Of Finishing Works For Functionality Of Tl-123 At Barc Near Visakhapatnam, A.p.
Supply, Installation, Testing And Commissioning Of Electrical Systems As A Part Of Finish
-Supply,-Installation,-Testing-And-Commissioning-Of-Electrical-Systems-As-A-Part-Of-Finish>2025-06-02
-Set-Of-Side-Wall-Complete-&-Roof-Complete-For-Lhb-Gs-Amrit-Bharat-Coachesnote:-(1)firm-Shall-Collect-All-Latest/final-Drawings-Before-Manufacturing.-There-May-Be-Minor-Modificati>India -Set-Of-Side-Wall-Complete-&-Roof-Complete-For-Lhb-Gs-Amrit-Bharat-Coachesnote:-(1)firm-Shall-Collect-All-Latest/final-Drawings-Before-Manufacturing.-There-May-Be-Minor-Modificati>Tender Invited For Set Of Side Wall Complete & Roof Complete (3 Items)
Set Of Side Wall Complete & Roof Complete For Lhb Gs Amrit Bharat Coachesnote:-(1)firm Shall Collect All Latest/final Drawings Before Manufacturing. There May Be Minor Modificati
-Set-Of-Side-Wall-Complete-&-Roof-Complete-For-Lhb-Gs-Amrit-Bharat-Coachesnote:-(1)firm-Shall-Collect-All-Latest/final-Drawings-Before-Manufacturing.-There-May-Be-Minor-Modificati>2025-06-02
India Construction And Repair Work Of Cc Road In Ward No. 58. 2025-06-02
Philippines 25bd0166 - Repair/maintenance Of Dole Building, National Conciliation And Mediation Board Regional Office 2, Carig Sur, Tuguegarao City, Cagayan 2025-06-02
-Repair/-Maint-To-Boundary-Wall,-Drainage,-Culvert,-Fencing,-Hardstanding-And-Footpath-In-The-Area-Of-Age-B/r-iv-Under>India -Repair/-Maint-To-Boundary-Wall,-Drainage,-Culvert,-Fencing,-Hardstanding-And-Footpath-In-The-Area-Of-Age-B/r-iv-Under>Repair Maint To Boundary Wall, Drainage, Culvert, Fencing, Hardstanding And Footpath In The Area Of Age B/r-iv Under Ge (awc) Mhow
Repair/ Maint To Boundary Wall, Drainage, Culvert, Fencing, Hardstanding And Footpath In The Area Of Age B/r-iv Under
-Repair/-Maint-To-Boundary-Wall,-Drainage,-Culvert,-Fencing,-Hardstanding-And-Footpath-In-The-Area-Of-Age-B/r-iv-Under>2025-06-02
India Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of 2x10 Mva, 33/11 Kv New Power Sub-stations, 33 & 11 Kv Lines, Bay Extension And Other Associated Works Under Darbhanga Electric Supply Circles Of Nbpdcl Under Revamped D 2025-06-02
India Construction Of Health Wellness Center At Village Aklia Block Bhikhi, Distt. Mansa. 2025-06-02
India Certain Repair And Servicing And Dg Sets And Connected Works At Dalhousie Cantt 2025-06-02
Whats app