Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Cremation Shed At Shamshanghat At Rehal Dhamalian Pyt. Rehal Dhamalian Block Bishnah Under Capex (pri) For The Financial Year 2025-2026. (pyt.level) 2025-09-22
India Tender For Hiring Of New Vehicle Pickup Category Of Type-ii (1.7 To 2.2 Ton Capacity) For Use Of J.e.(d/c) Cspdcl, Madded. 2025-09-22
-Refer-Boq>India -Refer-Boq>Constt Of Tile Path From Ho Ramzan Danak Towards Gh Hassan Malik
Refer Boq
-Refer-Boq>2025-09-22
-Construction-Of-Cement-Concrete-Road-(1).from-H/o---Bidya-Banik-Upto-H/o---Shanti-Sarkar-And-(2).-At-Malakar-Goli,r.c.c.wall-With-C.c.road-At-Ward-No.09>India -Construction-Of-Cement-Concrete-Road-(1).from-H/o---Bidya-Banik-Upto-H/o---Shanti-Sarkar-And-(2).-At-Malakar-Goli,r.c.c.wall-With-C.c.road-At-Ward-No.09>636-4
Construction Of Cement Concrete Road (1).from H/o - Bidya Banik Upto H/o - Shanti Sarkar And (2). At Malakar Goli,r.c.c.wall With C.c.road At Ward No.09
-Construction-Of-Cement-Concrete-Road-(1).from-H/o---Bidya-Banik-Upto-H/o---Shanti-Sarkar-And-(2).-At-Malakar-Goli,r.c.c.wall-With-C.c.road-At-Ward-No.09>2025-09-22
India Contactor (with Diode) For Compressor Unit, Rated Current: 32 Amp. (at rated Voltage & Ac-3 Utilization Category) Rated Voltage: 690v, Main pole: 3no, Auxiliary Contact: Inc, Control Voltage: 110v Dc +/- L5%, With surge Suppressor Confirming To Rdso Spec 2025-09-22
India Laying Of 25 Mm 20mm Dia Pvc Underground Pipe Line For Sanjabani Nursing Home, Ac276, Booth No19, Under Dmc Area 2025-09-22
-Repairing-Of-Existing-Fencing-Work-Along-Both-Side-Of-Helipad-Road-From-Gate-No-1-To-Banglar-Bari-Gate-Including-Supply-Of-Golden-Bamboo-Trees-At-Both-Sides-Helipad-Road-Within-The-Campus-Of-Dumurjala-Kh>India -Repairing-Of-Existing-Fencing-Work-Along-Both-Side-Of-Helipad-Road-From-Gate-No-1-To-Banglar-Bari-Gate-Including-Supply-Of-Golden-Bamboo-Trees-At-Both-Sides-Helipad-Road-Within-The-Campus-Of-Dumurjala-Kh>Wbhidco/ae-iii/gm E-ii/civil/nit-10/2025-2026
Repairing Of Existing Fencing Work Along Both Side Of Helipad Road From Gate No 1 To Banglar Bari Gate Including Supply Of Golden Bamboo Trees At Both Sides Helipad Road Within The Campus Of Dumurjala Kh
-Repairing-Of-Existing-Fencing-Work-Along-Both-Side-Of-Helipad-Road-From-Gate-No-1-To-Banglar-Bari-Gate-Including-Supply-Of-Golden-Bamboo-Trees-At-Both-Sides-Helipad-Road-Within-The-Campus-Of-Dumurjala-Kh>2025-09-22
India Revamping Of 1 Nos Clarifloculator Mechanism Bridge Walkway With Handrailing In Raw Water Treatment Plant At Ongc Hazira Plant 2025-09-22
India Construction Work Of 02 Class Rooms In Government Upper Primary School Khedia, Gram Panchayat Gawardi 2025-09-22
India Construction Of Shed Structure Beside Kesaipur Baroari Kalimandir Under Rhijuli-ii Gp (scheme Id Apas/01/089/238/0002) 2025-09-22
Whats app