Filter Search


Asia-Pacific


Location Summary Deadline
-Refer-Boq>India -Refer-Boq>Repairment And Renovation Of M S Pethgam
Refer Boq
-Refer-Boq>2025-09-22
India Execution Of All Permanent Way Zonal Works In The Section Between Ljr(ex) - jnrd(in) For The Period Ending 30.09.2026 Under The Jurisdiction Of sse(p.way)/amb Of Sambalpur Division. 2025-09-22
India Extension Of Fire Fighting System, Fire Alarm And Smoke Detector At Restricted Area Under Ge (south West) New Delhi 2025-09-22
India Tender Invited For Facility Management Service - Outcome Based##quantity: 331045## 2025-09-22
-The-Development-Of-It-Infrastructure-With-Data-And-Voice-Networking,-Cctv-For-The-District-Judges-Court-Building-At-Purulia,-Project-Id_-Jd2021299782s000-_installation-Of-Video-Conferencing-System-And-Telephone-System>India -The-Development-Of-It-Infrastructure-With-Data-And-Voice-Networking,-Cctv-For-The-District-Judges-Court-Building-At-Purulia,-Project-Id_-Jd2021299782s000-_installation-Of-Video-Conferencing-System-And-Telephone-System>Wbpwd/ee/bit/niq-55 Of 2025-26
The Development Of It Infrastructure With Data And Voice Networking, Cctv For The District Judges Court Building At Purulia, Project Id_ Jd2021299782s000 _installation Of Video Conferencing System And Telephone System
-The-Development-Of-It-Infrastructure-With-Data-And-Voice-Networking,-Cctv-For-The-District-Judges-Court-Building-At-Purulia,-Project-Id_-Jd2021299782s000-_installation-Of-Video-Conferencing-System-And-Telephone-System>2025-09-22
India O&m Desilting Of Field Channel From Chintalagunta Tank To Check Dam Meezuru (v) In D.v. Satram Mandal Of Tirupati District. 2025-09-22
Japan Multi-material 3d Color Printer Set 2025-09-22
India Flexible Hose Assly For Sand Ejector .#* Flexible Hose Assly. For Sand Ejector As Per Drg. No. Elw/bsl/3/68.104 [ Warranty period: 30 Months After The Date Of Delivery ] ] 2025-09-22
-Design,-Manufacture,-Supply,-Installation,-Testing-And-Commissioning-Of-Remote-Reset-Of-Plc-For-Psd-System-Of-Line-8.>India -Design,-Manufacture,-Supply,-Installation,-Testing-And-Commissioning-Of-Remote-Reset-Of-Plc-For-Psd-System-Of-Line-8.>Design, Manufacture, Supply, Installation, Testing And Commissioning Of Remote Reset Of Plc For Psd System Of Line-8.
Design, Manufacture, Supply, Installation, Testing And Commissioning Of Remote Reset Of Plc For Psd System Of Line-8.
-Design,-Manufacture,-Supply,-Installation,-Testing-And-Commissioning-Of-Remote-Reset-Of-Plc-For-Psd-System-Of-Line-8.>2025-09-22
India Set Of Double Ferrule Fittings Required For Lhb Coaches Consisting .#* Set Of Double Ferrule Fittings Required For Lhb Coaches Consisting Of :- 1. Male Elbow Connecto r (conical Seating) 3/4 Inch Od X M26 X 1.5(m) To Drg. No. Icf/std-3-5-137 Item-1, Qty-4 2025-09-22
Whats app