Filter Search


Asia-Pacific


Location Summary Deadline
India Design And Build Of Pedestrian Skywalk At Banashankari Intersection Including Connectivity Between Banashankari Metro Station And Ttmc Building Along With Shifting Of Utilities, Tree Removal, Landscaping, Electrical (lt And Ht) Works Etc. For Bmrcl. 2025-06-02
India Pin To Drg No. Rdso/cg/drg/21042-alt-1, Item-07 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] 2025-06-02
-Construction-Of-5.4-M-X-3.6-M-Switch-Room-With-Sanitary-And-Water-Supply-Arrangement,-Construction-Of-Boundary-Wall-And-Sinking-Of-3rd-Tube-well-By-D.r.-Rig-Method,-Of-Rajhat-Piped-Water-Supply-Scheme-Under-Chinsurah-S>India -Construction-Of-5.4-M-X-3.6-M-Switch-Room-With-Sanitary-And-Water-Supply-Arrangement,-Construction-Of-Boundary-Wall-And-Sinking-Of-3rd-Tube-well-By-D.r.-Rig-Method,-Of-Rajhat-Piped-Water-Supply-Scheme-Under-Chinsurah-S>Wbphe/ee/10/hug/2025-26, Sl-12
Construction Of 5.4 M X 3.6 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Sinking Of 3rd Tube-well By D.r. Rig Method, Of Rajhat Piped Water Supply Scheme Under Chinsurah S
-Construction-Of-5.4-M-X-3.6-M-Switch-Room-With-Sanitary-And-Water-Supply-Arrangement,-Construction-Of-Boundary-Wall-And-Sinking-Of-3rd-Tube-well-By-D.r.-Rig-Method,-Of-Rajhat-Piped-Water-Supply-Scheme-Under-Chinsurah-S>2025-06-02
Japan Tender Are Invited For Conducting Research On Need Analysis Of Apo Members assess The Ai-related Needs And Challenges Of Apo Members By Examining Ai Readiness, Technology Infrastructure, And Institutional Support; Analyze Gaps Between Current And Desired 2025-06-02
Taiwan Province of China Sub-terahertz Material Dielectric Property Measurement System 2025-06-02
Australia Elliott Way Ch27.5km Stabilisation Works Project - Sr00514 2025-06-02
India Supply Of Orthopaedics Implant. 2025-06-02
India 24 Metre Road Par Divider Par M.s Grill Work,r.g.n Scheme Bly. 2025-06-02
Australia At A Number Of Recent Ngn Forums The Topic Of Nitrogen N Banking And The Fit For N Banking In Different Parts Of The State Has Been Raised As A Priority. 2025-06-02
Japan A Set Of Servers For Next-generation Civil Engineering Work Estimation System (compatible With Electronic Procurement) 2025-06-02
Whats app