Filter Search


Asia-Pacific


Location Summary Deadline
Indonesia Non -installation Building Cleaning Management Cleaning Management Work 2025-05-14
Philippines Negotiated Early Procurementtwo-failed Biddings Of Drugs, Medicines, Medical Supplies And Devices, Ib No. Sb-2025-001-a-01 2025-05-14
India Ps Frahimpur Kaleshwarmau Ke Chhat, Farsh, Khidki, Diwal And Shauchalay Me Tiles Aadi Ka Marramat Ka Kary. 2025-05-14
qty:386
>India
qty:386
>Tender Invited For 443-612-386-001, 2574-2540-0104, 99000m24120-471, 990-115-007-000, 443-930-132-490, 442-972-410-484, 442-046-900-024
qty:386
qty:386
>2025-05-14
qty:1892
>India
qty:1892
>Tender Invited For Tape Nylon 66, 43 Mm Bs 9000 N U/d
qty:1892
qty:1892
>2025-05-14
-Foldable-Safety-Rail-For-2-Tier-Lhb-Coaches-To-Rcf-Drg.-No.lw-61274-Alt.-D.-Matl.&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months>India -Foldable-Safety-Rail-For-2-Tier-Lhb-Coaches-To-Rcf-Drg.-No.lw-61274-Alt.-D.-Matl.&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months>Tender Invited For Foldable Safety Rail For 2 Tier Lhb Coaches To Rcf Drg. No.lw 61274 Alt. D. Matl.& Spec. As Per Drg.
Foldable Safety Rail For 2 Tier Lhb Coaches To Rcf Drg. No.lw 61274 Alt. D. Matl.& Spec. As Per Drg. [ Warranty Period: 30 Months
-Foldable-Safety-Rail-For-2-Tier-Lhb-Coaches-To-Rcf-Drg.-No.lw-61274-Alt.-D.-Matl.&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months>2025-05-14
-Improvement-Of-Road-By-Cement-Concrete-(rmc-M-30)-Work-To-Maintain-Pot-Holes-Free-Road-From-Ganga-Action-Plan-Road-To-Khat-Pole-Under-Ward-No-50-Hmc-(l--815.00m,-Av.w--3.10m)-(2nd-Call)>India -Improvement-Of-Road-By-Cement-Concrete-(rmc-M-30)-Work-To-Maintain-Pot-Holes-Free-Road-From-Ganga-Action-Plan-Road-To-Khat-Pole-Under-Ward-No-50-Hmc-(l--815.00m,-Av.w--3.10m)-(2nd-Call)>Wb-hmc/nit/ed/01/ee-ii/25-26
Improvement Of Road By Cement Concrete (rmc M-30) Work To Maintain Pot Holes Free Road From Ganga Action Plan Road To Khat Pole Under Ward No-50 Hmc (l- 815.00m, Av.w- 3.10m) (2nd Call)
-Improvement-Of-Road-By-Cement-Concrete-(rmc-M-30)-Work-To-Maintain-Pot-Holes-Free-Road-From-Ganga-Action-Plan-Road-To-Khat-Pole-Under-Ward-No-50-Hmc-(l--815.00m,-Av.w--3.10m)-(2nd-Call)>2025-05-14
India Upgrading Of Iso 22163 From Rev 03 To 04 In Rwf, Training Of Internal Auditors (25 Nos.) On Iso 22163 Rev. 04, And Support During Iso 22163 External Re-certification Audit 2025-05-14
Japan Spectral Cell Analyzer Set 2025-05-14
Tuvalu Assessment Of Rooftop Solar Pv Systems On Electricity Grid Infrastructure In Tuvalu 2025-05-14
Whats app