Filter Search


Asia-Pacific


Location Summary Deadline
-Kanki-Goagaon-Road-12.00-Kmp-to-15.00-Kmp-and-18.50-Km-to-23.40-km-repairing-and-maintenance-work-in-stretches-under-Uttar-Dinajpur-Highway-Division-in-the-District-of-Uttar-Dinajpur>India -Kanki-Goagaon-Road-12.00-Kmp-to-15.00-Kmp-and-18.50-Km-to-23.40-km-repairing-and-maintenance-work-in-stretches-under-Uttar-Dinajpur-Highway-Division-in-the-District-of-Uttar-Dinajpur>NIT_03 OF EEUDHD 2025_26
Kanki Goagaon Road 12.00 Kmp to 15.00 Kmp and 18.50 Km to 23.40 km repairing and maintenance work in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
-Kanki-Goagaon-Road-12.00-Kmp-to-15.00-Kmp-and-18.50-Km-to-23.40-km-repairing-and-maintenance-work-in-stretches-under-Uttar-Dinajpur-Highway-Division-in-the-District-of-Uttar-Dinajpur>2025-05-08
India Dismantling And Sale Of Condemned Buildings In Sr Den/west/mas Jurisdiction (the Highest Bidder Has To Pay The Amount To Railways) - Part-i. 2025-05-08
India Gram Panchayat Bijaliya Ke Adhinasth Villages Me Nali Road Or Kachra Sangran V Saph Saphai Work 2025-05-08
India Supply, Delivery And Installation Of 4k Laser Projector (sony -vpl-xw 5000es) And Its Accessories To Vice Chairman Bungalow In Tirupati 2025-05-08
India Construction Of Rcc Drain In Dlk Road From D. No. 16-25-25 To D.no. 16-25-22 In Ward No. 03 In Tanuku Municipality (15th Fc Grant, 2020-21, 2nd Installment) 2025-05-08
-Bogie-Frame-Assembly-For-Coil-Spring-Lhb-Coaches.-Drawing-No.-:-Rcf's-Drg.-No.-Lw03007,-Alt.-"g"-Or-Latest.-Matl.&-Specn-:-Mdts-213,-Rev.-04-Or-Latest.-[-Warranty-Period:-84-Months-After-Th>India -Bogie-Frame-Assembly-For-Coil-Spring-Lhb-Coaches.-Drawing-No.-:-Rcf's-Drg.-No.-Lw03007,-Alt.-"g"-Or-Latest.-Matl.&-Specn-:-Mdts-213,-Rev.-04-Or-Latest.-[-Warranty-Period:-84-Months-After-Th>Supply Of Bogie Frame Assembly For Coil Spring Lhb Coaches.
Bogie Frame Assembly For Coil Spring Lhb Coaches. Drawing No. : Rcf's Drg. No. Lw03007, Alt.-"g" Or Latest. Matl.& Specn : Mdts 213, Rev.-04 Or Latest. [ Warranty Period: 84 Months After Th
-Bogie-Frame-Assembly-For-Coil-Spring-Lhb-Coaches.-Drawing-No.-:-Rcf's-Drg.-No.-Lw03007,-Alt.-"g"-Or-Latest.-Matl.&-Specn-:-Mdts-213,-Rev.-04-Or-Latest.-[-Warranty-Period:-84-Months-After-Th>2025-05-08
India Request For Proposal For Management And Operation & Maintenance Of Gateway Of Guwahati Terminal Under Assam Inland Waterways Company Limited 2025-05-08
India Construction Of Smsshan Chulli At Bonki Swashman Ghat At Akui 1 Gp Under Indas Development Block Under District Mineral Foundation Fund. 2025-05-08
-Allotment-Of-Midc-Plot-On-As-Is-Where-Is-Basis-For-Categories-Mentioned-In-Tender-Document-As-Point-No.4-Only>India -Allotment-Of-Midc-Plot-On-As-Is-Where-Is-Basis-For-Categories-Mentioned-In-Tender-Document-As-Point-No.4-Only>Barshi Midc Indutrial Plot No.b-31, Area 33259,upset Rate Rs.751/sqm
Allotment Of Midc Plot On As Is Where Is Basis For Categories Mentioned In Tender Document As Point No.4 Only
-Allotment-Of-Midc-Plot-On-As-Is-Where-Is-Basis-For-Categories-Mentioned-In-Tender-Document-As-Point-No.4-Only>2025-05-08
-Online-E-bidding-Allotment>India -Online-E-bidding-Allotment>Wardha Industrial Area Plot No. F-2/44
Online E-bidding Allotment
-Online-E-bidding-Allotment>2025-05-08
Whats app