Filter Search


Asia-Pacific


Location Summary Deadline
India Repair To Path Hard Standing Interlocking Tiles Drains And Miscellaneous Br Works At Sector B Under Age Brii Of Ge 865 Ews 2025-05-17
India Repair / Replacement Of Certain B/r And E/m Items At Pb Enclave Under Age B/r-i Of Ge (n) Udhampur. 2025-05-17
India Repair Replacement To False Ceiling Wall Panelling Wooden Flooring Joinery And Miscellaneous Br Works To Buildings Of Sector A Including Internal Electric Works Under Age Brii Of Ge 865 Ews 2025-05-17
India Provn Of Certain Toilets And Addition/alteration To Existing Toilets At Various Locations At Af Station Dalhousie 2025-05-17
-Protection-Work-Along-Left-Embankment-Of-River-Hooghly(length-800m)from-Pulermar-Sluice-To-Hatkhola-Sluice-At-Noorpur-Within-Block-Diamond-Harbour-ii,-P.s.-ramnagar,dist.-south24pgs.>India -Protection-Work-Along-Left-Embankment-Of-River-Hooghly(length-800m)from-Pulermar-Sluice-To-Hatkhola-Sluice-At-Noorpur-Within-Block-Diamond-Harbour-ii,-P.s.-ramnagar,dist.-south24pgs.>Wbiw/ctu/ce(s)/e-nit-03(e) /2025-26sl01
Protection Work Along Left Embankment Of River Hooghly(length 800m)from Pulermar Sluice To Hatkhola Sluice At Noorpur Within Block Diamond Harbour-ii, P.s.-ramnagar,dist.-south24pgs.
-Protection-Work-Along-Left-Embankment-Of-River-Hooghly(length-800m)from-Pulermar-Sluice-To-Hatkhola-Sluice-At-Noorpur-Within-Block-Diamond-Harbour-ii,-P.s.-ramnagar,dist.-south24pgs.>2025-05-17
India Repair Replacement To False Ceiling Wall Panelling Wooden Flooring Joinery And Miscellaneous Br Works To Buildings Of Sector B Including Internal Electric Works Under Age Brii Of Ge 865 Ews 2025-05-17
-Anti-erosion-Work-To-Fill-Up-Scour-Hole-Along-Left-Bank-Of-River-Hooghly-Adjacent-To-Roypur-Jetty-For-A-Length-Of-650m-Within-Block--budge-Budge--ii,p.s.-nodakhali,-Dist.--South-24pgs>India -Anti-erosion-Work-To-Fill-Up-Scour-Hole-Along-Left-Bank-Of-River-Hooghly-Adjacent-To-Roypur-Jetty-For-A-Length-Of-650m-Within-Block--budge-Budge--ii,p.s.-nodakhali,-Dist.--South-24pgs>Wbiw/ctu/ce(s)/e-nit-03(e)/ 2025-26 Sl02
Anti-erosion Work To Fill Up Scour Hole Along Left Bank Of River Hooghly Adjacent To Roypur Jetty For A Length Of 650m Within Block -budge Budge -ii,p.s.-nodakhali, Dist.- South 24pgs
-Anti-erosion-Work-To-Fill-Up-Scour-Hole-Along-Left-Bank-Of-River-Hooghly-Adjacent-To-Roypur-Jetty-For-A-Length-Of-650m-Within-Block--budge-Budge--ii,p.s.-nodakhali,-Dist.--South-24pgs>2025-05-17
India Comprehensive B/r Repairs In Wsas In Technical Area At Af Stn Pathankot 2025-05-17
India Supply And Installation Of Plastic Slatted Floor, Frp Support Network, Partition, Side Curtain Feed Tray And Water Tray For Buck Shed, Isolation Shed And Quarantine Shed At Regional Semen Production Laboratory And Semen Bank For Goat At Katulpur 2025-05-17
India Purchase of Welding and Gas Cutting Accessories at Kandri Mine -1 Leather Hand Gloves 6 Nos., 2 Rgulator Acetylene (da) 6 Nos., 3 Regulator Oxygen 6 Nos., 4 Welding Holder 600a. 12 Nos., 5, Flashback Arrestor (protex Ro) for, Oxygen, 3 Nos., 6, Flashback Arrestor Protex Ra) for, Acetylene, 3 Nos., 7 2025-05-17
Whats app