Filter Search


Asia-Pacific


Location Summary Deadline
India R And M Of Various Office Bldgs In Bundi City. 2025-12-26
India Miscellaneous Electrical Work As And When Required Basis. Sh- Electrical Works For New Offices Canteen And Staff Car Parking At Jalgaon Airport 2025-12-26
India Overhauling Kit For Rotex Magnet Valve, Horn Model No: 31133-10 Consisting Of 11 items. .#* Overhauling Kit For Rotex Magnet Valve, Horn Model No: 31133-10 Consisting Of 11 Items. [ warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-26
Korea Republic of Jeju Native Plant Functional Raw Material Development Field Trip Education Program Service 2025-12-26
-Construction-Of-Masonry-Surface-Drain-Works-In-Front-Of-Chinmoy-Singha-House-In-Ward-xi-Booth-No.-112,-Within-Jaynagar-Majilpur-Municipality-Under-Apas-(apas/01/136/112/0014)>India -Construction-Of-Masonry-Surface-Drain-Works-In-Front-Of-Chinmoy-Singha-House-In-Ward-xi-Booth-No.-112,-Within-Jaynagar-Majilpur-Municipality-Under-Apas-(apas/01/136/112/0014)>Wbmad/ulb/joynagar-mozilpur/ Aaps/44/2025-26 Sl09
Construction Of Masonry Surface Drain Works In Front Of Chinmoy Singha House In Ward-xi Booth No.-112, Within Jaynagar Majilpur Municipality Under Apas (apas/01/136/112/0014)
-Construction-Of-Masonry-Surface-Drain-Works-In-Front-Of-Chinmoy-Singha-House-In-Ward-xi-Booth-No.-112,-Within-Jaynagar-Majilpur-Municipality-Under-Apas-(apas/01/136/112/0014)>2025-12-26
India Repairs Of Defects And Supply Of Spares For Kl 07 Ca 9089 (four Wheeler) Vehicle Spares, Painting, Sticker Work, Hydraulic Work, Speedometer, Clutch Plate, Radiator, Chemical Wash, Electrical Work, Full Bodywork 2025-12-26
India Epc, Testing, Commissioning, Trial Run For 3 Months Operation & Maintenance Including Replacement & Repairing Of Drains, 1 Nos Stps Of Capacity 2.20 Mld With Sbr Technology Including Designing, P/l/l/j Of Rcc Np3 Pipes Interceptor Sewer Of Length 2472 M ( 2025-12-26
-Kiifb-Deposit-Work-Kiifb-Cwss-To-Kallikkad-Utility-Shifting-Due-To-Reconstruction-Of-Kallikkad-Bridge-Across-Nip-Canal-And-Construction-Of-Kallikkad-Mukundara-Bridge-Across-Neyyar-River>India -Kiifb-Deposit-Work-Kiifb-Cwss-To-Kallikkad-Utility-Shifting-Due-To-Reconstruction-Of-Kallikkad-Bridge-Across-Nip-Canal-And-Construction-Of-Kallikkad-Mukundara-Bridge-Across-Neyyar-River>Wrd/kwa-ce(sr)/est/13551/2024
Kiifb Deposit Work Kiifb Cwss To Kallikkad Utility Shifting Due To Reconstruction Of Kallikkad Bridge Across Nip Canal And Construction Of Kallikkad Mukundara Bridge Across Neyyar River
-Kiifb-Deposit-Work-Kiifb-Cwss-To-Kallikkad-Utility-Shifting-Due-To-Reconstruction-Of-Kallikkad-Bridge-Across-Nip-Canal-And-Construction-Of-Kallikkad-Mukundara-Bridge-Across-Neyyar-River>2025-12-26
Malaysia To Supply And Delivery Calcium Carbonate At Fico Oil Mill, Lahad Datu Sabah From January - December 2026 2025-12-26
India E-tender For Leasing Shop Premises Constructed Under The Zilla Parishad Ses At Arni, Taluka Arni, For A Period Of 10 Years. The Tender Includes 12 Shops (g-1 To G-6 On The Ground Floor And F-1 To F-6 On The First Floor) With Specific Dimensions And Monthl 2025-12-26
Whats app