Filter Search


Asia-Pacific


Location Summary Deadline
India Road Protection Work With Bamboo Pilling And Earth Filling From Kajem House Towards Awam House At Kalitala Sk Para, 2025-12-31
India Collar Finish Machined To Icfs Drg. No. T-o-2-628 Etc. .#* Collar Finish Machined To Icfs Drg. No. T-o-2-628, Alt. No.- F/4. [ Warranty Peri od: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po V 2025-12-31
India Construction For Bihta-sarmera Sh-78 2025-12-31
India Tender Invited For Slip Gauges / Gauge Blocks (q3)##quantity: 1## 2025-12-31
India Kit For Drivers Br.controller - 790034101, Sealing Strip-12.7wd.x6mmthk, Control Air Release Valve, O Ring (id-23.81xwidth-2.62). Please Read The Ftrtil Part Number Ab11-265a Instead Of 001608000a As Mentioned In The Tender. We Confirm That There Is Only 2025-12-31
India Tender Invited For Rfq_item_10 , Rfq_item_20 , Rfq_item_30 , Rfq_item_40 , Rfq_item_50 , Rfq_item_60 , Rfq_item_70 , Rfq_item_80 , Rfq_item_90 , Rfq_item_100 , Rfq_item_110 , Rfq_item_120 , Rfq_item_130##quantity: 68300## 2025-12-31
India Auxiliary Switch Stack For 25kv .#* Auxiliary Switch Stack For 25kv Sf6 Circuit Breaker Of Model 50-sfgp-20a (8no+8nc). Accep ted Make- Cgl Only (detailed Specification Is Attached In Documents Section). [ Warranty Period: 30 Mont hs After The Date Of Del 2025-12-31
-Equipements-2025-26-02-.#*-Item-Names:-Supplying,-Installing,-Testing-And-Commissioning-Of-10kw-Hybrid-Type-Roof-top-Solar-S>India -Equipements-2025-26-02-.#*-Item-Names:-Supplying,-Installing,-Testing-And-Commissioning-Of-10kw-Hybrid-Type-Roof-top-Solar-S>Supplying, Installing, Testing And Commissioning Of 10kw Hybrid Type Roof-top Solar System At Bhadra Cada Campus, Shivamogga
Equipements-2025-26-02 .#* Item Names: Supplying, Installing, Testing And Commissioning Of 10kw Hybrid Type Roof-top Solar S
-Equipements-2025-26-02-.#*-Item-Names:-Supplying,-Installing,-Testing-And-Commissioning-Of-10kw-Hybrid-Type-Roof-top-Solar-S>2025-12-31
India Construction Of Six Lane Greenfield Highway Starting From Its Junction With Nh4b (new Nh348) Near Pagote (design Km. 0.000) Till Its Junction On Nh48 At Chowk (design Km. 29.219) In Maharashtra To Be Executed On Bot (toll) Mode Under Nh(o) 2025-12-31
India Repair And Maintenance Of Internal Electrical Infrastructure At N1, Nair, Kuldeep And N4 At Afs Kanpur. 2025-12-31
Whats app