Filter Search


Mediterranean


Location Summary Deadline
Spain Construction Works Of Urbanization Annexed To The New Maintenance Base Of Ronda (malaga) 2025-01-15
Spain Consulting And Technical Assistance Services For The Drafting Of Construction Projects For New Maintenance Bases In Ourense, Monforte De Lemos And Ferrol 2025-01-15
Spain Technical Assistance For The Treatment Work On The Infrastructure Of Tunnel Nº 68 Of Capçanes. Line 2025-01-15
Spain Technical Assistance To Stabilization Works Of Clearings Between The Pp.kk. 141+681 And 145+380 On Line 040. Madrid-chamartín - Clara Campoamor- Valencia-joaquín Sorolla 2025-01-15
Spain Technical Assistance For The Control Of The Sleeper And Rail Replacement Works On Line 710 Castejón – Alsasua. Castejón De Ebro – Tafalla Subsection From Station 102+553 To Station 137+498 2025-01-15
Spain Technical Assistance For The Control Of The Execution Of New Track And Electrification At The Requejada Station 2025-01-15
Spain Technical Assistance For The Control Of The Sleeper And Rail Replacement Works On Line 700 Casetas – Bilbao. Castejón De Ebro Subsection – Irún Headquarters Limit Of The P.k. 1+260 At P.k. 81+600 2025-01-15
Spain Technical Assistance Services For The Control And Surveillance Of The Execution Works Of The Construction Project For The Extension Of Track Lengths To 750 M In Stations Of The Section 2025-01-15
Spain Execution Works Of The Construction Project For The Assembly Of A Third Wire In The La Encina Tunnel And Its Connection With The Conventional And High-speed Lines On The Xàtiva Side. Infrastructure, Road And Electrification. 2025-01-15
Spain Sleeper Renovation Works (phase 4) On The Madrid-seville High-speed Line. 2025-01-15
Whats app