Filter Search


Mediterranean


Location Summary Deadline
Spain Technical Assistance For The Control And Surveillance Of The Execution Work Of The Construction Project Of The Complementary Actions For The Commissioning Of The New Railway Access Of The High-speed Line Madrid – Castilla La Mancha – Valencian Community – 2025-01-15
Spain Construction Works Of Urbanization Annexed To The New Maintenance Base Of Ronda (malaga) 2025-01-15
Spain Consulting And Technical Assistance Services For The Drafting Of Construction Projects For New Maintenance Bases In Ourense, Monforte De Lemos And Ferrol 2025-01-15
Spain Technical Assistance For The Treatment Work On The Infrastructure Of Tunnel Nº 68 Of Capçanes. Line 2025-01-15
Spain Technical Assistance To Stabilization Works Of Clearings Between The Pp.kk. 141+681 And 145+380 On Line 040. Madrid-chamartín - Clara Campoamor- Valencia-joaquín Sorolla 2025-01-15
Spain Technical Assistance For The Control Of The Sleeper And Rail Replacement Works On Line 710 Castejón – Alsasua. Castejón De Ebro – Tafalla Subsection From Station 102+553 To Station 137+498 2025-01-15
Spain Technical Assistance For The Control Of The Execution Of New Track And Electrification At The Requejada Station 2025-01-15
Spain Technical Assistance For The Control Of The Sleeper And Rail Replacement Works On Line 700 Casetas – Bilbao. Castejón De Ebro Subsection – Irún Headquarters Limit Of The P.k. 1+260 At P.k. 81+600 2025-01-15
Spain Technical Assistance Services For The Control And Surveillance Of The Execution Works Of The Construction Project For The Extension Of Track Lengths To 750 M In Stations Of The Section 2025-01-15
Spain Execution Works Of The Construction Project For The Assembly Of A Third Wire In The La Encina Tunnel And Its Connection With The Conventional And High-speed Lines On The Xàtiva Side. Infrastructure, Road And Electrification. 2025-01-15
Whats app