Filter Search


Asia


Location Summary Deadline
Iran Islamic Republic of Purchase 20000 Kg Soybean Meal 2025-01-22
Iran Islamic Republic of Assignment Transportation Services Works Of Company Complex At Mahshahr , Site 4 Of Imam Khomeini Port 2025-01-22
-Spring-For-Motor-Contactor-To-Drg.no.4twd-112--029-A.-Alt-4-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-T>India -Spring-For-Motor-Contactor-To-Drg.no.4twd-112--029-A.-Alt-4-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-T>Supply Of Spring For Motor Contactor To Drg.no.4twd-112- 029 A. Alt 4
Spring For Motor Contactor To Drg.no.4twd-112- 029 A. Alt 4 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , T
-Spring-For-Motor-Contactor-To-Drg.no.4twd-112--029-A.-Alt-4-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-T>2025-01-22
Iran Islamic Republic of Development Coke Storage Works With Area About 7762 M2 2025-01-22
qty:30
>India
qty:30
>Supply Of Emergency Recovery Trolley (q3)
qty:30
qty:30
>2025-01-22
Iran Islamic Republic of Design, Purchase, Installation And Setup Paging System Of Company Complex At Mahshahr 2025-01-22
-Set-Of-Copper-Lugs-Of-Make-Dowells/chetna-Engineering/kamalesh-Industries/electro-Lugs-Andterminals-Pvt-Ltd.-Set-And-Quantity-As-Per-Attached-Annexure-(7-Items-As-Consists-In-A-+b)-[-Warranty-Period:-30-Months-After-The>India -Set-Of-Copper-Lugs-Of-Make-Dowells/chetna-Engineering/kamalesh-Industries/electro-Lugs-Andterminals-Pvt-Ltd.-Set-And-Quantity-As-Per-Attached-Annexure-(7-Items-As-Consists-In-A-+b)-[-Warranty-Period:-30-Months-After-The>Supply Of Set Of Copper Lugs
Set Of Copper Lugs Of Make Dowells/chetna Engineering/kamalesh Industries/electro Lugs Andterminals Pvt Ltd. Set And Quantity As Per Attached Annexure (7 Items As Consists In A +b) [ Warranty Period: 30 Months After The
-Set-Of-Copper-Lugs-Of-Make-Dowells/chetna-Engineering/kamalesh-Industries/electro-Lugs-Andterminals-Pvt-Ltd.-Set-And-Quantity-As-Per-Attached-Annexure-(7-Items-As-Consists-In-A-+b)-[-Warranty-Period:-30-Months-After-The>2025-01-22
India 2024-25 Lorikadavu Anchangadi Beach Happiness Park Work 2025-01-22
-Copper-Flat-Of-Size:-40x-7mm-Confirming-To-Clw-Specification-No.clw/es/c-36-Alt-e.-Length-Of-Each-Copper-Flat-Is-3-Meters.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Copper-Flat-Of-Size:-40x-7mm-Confirming-To-Clw-Specification-No.clw/es/c-36-Alt-e.-Length-Of-Each-Copper-Flat-Is-3-Meters.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Copper Flat
Copper Flat Of Size: 40x 7mm Confirming To Clw Specification No.clw/es/c-36 Alt-e. Length Of Each Copper Flat Is 3 Meters. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Copper-Flat-Of-Size:-40x-7mm-Confirming-To-Clw-Specification-No.clw/es/c-36-Alt-e.-Length-Of-Each-Copper-Flat-Is-3-Meters.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-01-22
-Set-Of-Root-Pump-01-Set-Consisting-Of-07-Item-(i)-Root-Pump-Rotary-Set-(2-No)-,qty-01-No-(ii)-Bearing-,qty-06-No-(iii)-Oil-Seal,-Qty-02-No-(iv)-Vacuum-Seal-,qty-02-No-(v)-Metal-Sprocket-,-Qty-02-Nos-(vi)-Metal-Sprocket-Sup>India -Set-Of-Root-Pump-01-Set-Consisting-Of-07-Item-(i)-Root-Pump-Rotary-Set-(2-No)-,qty-01-No-(ii)-Bearing-,qty-06-No-(iii)-Oil-Seal,-Qty-02-No-(iv)-Vacuum-Seal-,qty-02-No-(v)-Metal-Sprocket-,-Qty-02-Nos-(vi)-Metal-Sprocket-Sup>Supply Of Set Of Root Pump
Set Of Root Pump 01 Set Consisting Of 07 Item (i) Root Pump Rotary Set (2 No) ,qty-01 No (ii) Bearing ,qty-06 No (iii) Oil Seal, Qty-02 No (iv) Vacuum Seal ,qty-02 No (v) Metal Sprocket , Qty-02 Nos (vi) Metal Sprocket Sup
-Set-Of-Root-Pump-01-Set-Consisting-Of-07-Item-(i)-Root-Pump-Rotary-Set-(2-No)-,qty-01-No-(ii)-Bearing-,qty-06-No-(iii)-Oil-Seal,-Qty-02-No-(iv)-Vacuum-Seal-,qty-02-No-(v)-Metal-Sprocket-,-Qty-02-Nos-(vi)-Metal-Sprocket-Sup>2025-01-22
Whats app