Filter Search


Asia


Location Summary Deadline
qty:9
>India
qty:9
>Supply Of Multicolour Dumbell Sets With St, Gym Ball For Exercise With Foot Pump, Spin Bike Exercise Cycle, Pushup Board, Gym Flooring Mat, Multifunctional Weight Training Kit
qty:9
qty:9
>2025-01-20
India Supply Of Oxygen, Da (acetylene) & Nitrogen Gas At Gbps, Utran (for 02 (two) Years). 2025-01-20
-Male-Elbow-Connector-1"-Od-X-1"-Bspt-For-Double-Ferrule-Compression-Tube-Fittings-Asper-The-Drawing-No.-Icf/std-3-5-023,-Item-No-4,-And-Material-Spec:-Icf/md-166-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery>India -Male-Elbow-Connector-1"-Od-X-1"-Bspt-For-Double-Ferrule-Compression-Tube-Fittings-Asper-The-Drawing-No.-Icf/std-3-5-023,-Item-No-4,-And-Material-Spec:-Icf/md-166-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery>Supply Of Male Elbow Connector
Male Elbow Connector 1" Od X 1" Bspt For Double Ferrule Compression Tube Fittings Asper The Drawing No. Icf/std-3-5-023, Item No-4, And Material Spec: Icf/md-166 [ Warranty Period: 30 Months After The Date Of Delivery
-Male-Elbow-Connector-1"-Od-X-1"-Bspt-For-Double-Ferrule-Compression-Tube-Fittings-Asper-The-Drawing-No.-Icf/std-3-5-023,-Item-No-4,-And-Material-Spec:-Icf/md-166-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery>2025-01-20
qty:40
>India
qty:40
>Supply Of Ms Office 2024 Professional, Adobe Acrobat Professional, Window 11 Operating Systems Software, Corel Draw Graphic Suite 2024, Quick Heal Antivirus Pro 1 User 1 Year
qty:40
qty:40
>2025-01-20
India Rfs of Solar Rooftop Power Developers for Setting Up of Cumulative Capacity of 18.00 Mw Grid Connected Rooftop Solar Pv Power Projects (without Battery Storage) on Union Government Buildings in the States of Nct of Delhi, Punjab, Rajasthan, Haryana, Uttar Pradesh, Bihar, Jharkhand, Madhya Pradesh, C 2025-01-20
India Supply Of Dual Transducer Contact Transducer Cable For Contact Transducer 2025-01-20
qty:1
>India
qty:1
>Supply Of Paper Shredding Machines (v2) (q3)
qty:1
qty:1
>2025-01-20
India Selection Of A Public Relations (pr) Management Firm For Civil Works. 2025-01-20
India Resurfacing Of Valadungara Padavala Road Km 0/0 To 4/00 Taluka : District : . (package No. Kp / 23-24/p-46) 2025-01-20
qty:50
>India
qty:50
>Supply Of Beta-cyfluthrin 2 45% Sc (responsar)
qty:50
qty:50
>2025-01-20
Whats app