Filter Search


Asia


Location Summary Deadline
India Preparation Of Tableau For 26th January, 2025 Republic Day Parade 2025-01-11
India Making Of Shed At Paraspal Village, Providing & Laying Of Pcc, Earth Work Excavation, Boulder Soulling (rr Min 300 Mm Thick), 20 Mm Thk Plastering Incl.sand, Scaffol, Breaking Of Brick / Block Masonry, Pro. & Fixing Of Ceramic Flooring Tiles, Steel Handli 2025-01-11
India Supply Of Actuator, Electric. 2025-01-11
India Supply Of Simn, Qty: 3500 Mt, Silico Manganese, Medium Carbon. 2025-01-11
India Providing, Replacement Of Rubber Lining With New Natural Rubber By Hot Bonding Process For Existing Bulk And Day Storage Msrl Sodium Hypo Chlorite Tanks At Pre-treatment Plant Of Unit-2 Including To And Fro Transportation And Other Works 2025-01-11
India Supply Of Elcsimn, Qty: 400 Mt, Silico Manganese, Extra Low Carbon. 2025-01-11
India Providing, Erection And Commissioning Of Upvc Drinking Water Pipeline And Dismantling Of Existing Gi Pipeline At Btps 2025-01-11
India Restoration Of Potholes From Busstand To Kanakadasa Circle And Depot Road In Gangavathi City Limits 2025-01-11
India Manpower For Material Shifting-upstream, Hiring Of Supervisor, Supply Of Manpower, Services Of Rigger, Deployment Of Rigging Foremen. 2025-01-11
India Work Of Widening To Two Lanes With Paved Shoulder (except In Flyover Part Of 500m) From Km 122.15 To Km 138.20 Of Nh-114a Within Available Row In The State Of Jharkhand Under Epc Mode (working Length Of The Project As Per Tcs – 14 Km). 2025-01-11
Whats app