Filter Search


Asia


Location Summary Deadline
India 200135721 Biennial Contract For Rubber Lining Of Cpu Vessels At Khstps Stage Ii 2025-01-17
-Construction-Of-Boundary-Wall-Of-Goruikhali-Kabarsthan-Mouza-balarampur,-J.l.-No.40,-Plot-No.-31/1075under-Sahid-Matangini-Block-Under-Beup-2024-25,-203-tamluk-A.c.>India -Construction-Of-Boundary-Wall-Of-Goruikhali-Kabarsthan-Mouza-balarampur,-J.l.-No.40,-Plot-No.-31/1075under-Sahid-Matangini-Block-Under-Beup-2024-25,-203-tamluk-A.c.>Pmn/nit/24/23-24/pmzp/pm/sl-12
Construction Of Boundary Wall Of Goruikhali Kabarsthan Mouza-balarampur, J.l. No.40, Plot No.-31/1075under Sahid Matangini Block Under Beup-2024-25, 203-tamluk A.c.
-Construction-Of-Boundary-Wall-Of-Goruikhali-Kabarsthan-Mouza-balarampur,-J.l.-No.40,-Plot-No.-31/1075under-Sahid-Matangini-Block-Under-Beup-2024-25,-203-tamluk-A.c.>2025-01-17
Mongolia Zdtg-transport Fuel 2025-01-17
-connector-with-washer-of-ep-contactor-as-per-drg.no.-trs/gmo/m-5/3ph/091/ecr.-one-set-consist-2-items.-[-warranty-period:-30-months-after-the-date-of-delivery-]-]>India -connector-with-washer-of-ep-contactor-as-per-drg.no.-trs/gmo/m-5/3ph/091/ecr.-one-set-consist-2-items.-[-warranty-period:-30-months-after-the-date-of-delivery-]-]>Supply of connector with washer of ep contactor as per drg.no. trs/gmo/m-5/3ph/091/ecr. one set consist 2 items.
connector with washer of ep contactor as per drg.no. trs/gmo/m-5/3ph/091/ecr. one set consist 2 items. [ warranty period: 30 months after the date of delivery ] ]
-connector-with-washer-of-ep-contactor-as-per-drg.no.-trs/gmo/m-5/3ph/091/ecr.-one-set-consist-2-items.-[-warranty-period:-30-months-after-the-date-of-delivery-]-]>2025-01-17
India Renewal Of Narayanpurwa Koriyanpurwa Pitch Road To Tepra Paschim Tepra Poorvi Via Kudwa Link Road 2025-01-17
-Construction-Of-Concrete-Road-From-Dhalai-Road-To-Apurbalal-Maity-Pond-Mouza-dumra,-J.l.-No.41,-Plot-No.371-670-Under-Sahid-Matangini-Block-Under-Beup-2024-25,-203-tamluk-A.c.>India -Construction-Of-Concrete-Road-From-Dhalai-Road-To-Apurbalal-Maity-Pond-Mouza-dumra,-J.l.-No.41,-Plot-No.371-670-Under-Sahid-Matangini-Block-Under-Beup-2024-25,-203-tamluk-A.c.>Pmn/nit/24/23-24/pmzp/pm/sl-2
Construction Of Concrete Road From Dhalai Road To Apurbalal Maity Pond Mouza-dumra, J.l. No.41, Plot No.371-670 Under Sahid Matangini Block Under Beup-2024-25, 203-tamluk A.c.
-Construction-Of-Concrete-Road-From-Dhalai-Road-To-Apurbalal-Maity-Pond-Mouza-dumra,-J.l.-No.41,-Plot-No.371-670-Under-Sahid-Matangini-Block-Under-Beup-2024-25,-203-tamluk-A.c.>2025-01-17
Kazakhstan Pipe Bends 2025-01-17
-As-Per-Nit>India -As-Per-Nit>Drainage And P Work Of Tractor Road Sawlakote Road To Hs Tanger W No 2 Block Gandhri
As Per Nit
-As-Per-Nit>2025-01-17
-power-contactor-rated-cu>India -power-contactor-rated-cu>Supply of power contactor rated current 170 amp. 415vac, 50 hz, 3 pole, coil voltage 110vac, auxiliary contacts 2no+2nc, type ac3, contactor size 8, with add on block 1no+1nc (right & left) as per siemens cat no. 3tf5202- 0a & 3ty7561-1ka008k conforming to is/iec 60947
power contactor rated cu
-power-contactor-rated-cu>2025-01-17
India Ct/pt Ratio Change And Sntp Enabling M/s Secure Make Energy Meters 2025-01-17
Whats app