Filter Search


Asia


Location Summary Deadline
-Maintenance-of-Pump-House-of-Gopalganj-Major-RLI-Schemes-Under-Arambagh(A-M)-Sub--Division-under-Chinsurah-(A-M)-Division-under-Non-Plan-Programme-in-the-District-of-Hooghly>India -Maintenance-of-Pump-House-of-Gopalganj-Major-RLI-Schemes-Under-Arambagh(A-M)-Sub--Division-under-Chinsurah-(A-M)-Division-under-Non-Plan-Programme-in-the-District-of-Hooghly>Maintenance of Pump House of Gopalganj
Maintenance of Pump House of Gopalganj Major RLI Schemes Under Arambagh(A-M) Sub- Division under Chinsurah (A-M) Division under Non-Plan Programme in the District of Hooghly
-Maintenance-of-Pump-House-of-Gopalganj-Major-RLI-Schemes-Under-Arambagh(A-M)-Sub--Division-under-Chinsurah-(A-M)-Division-under-Non-Plan-Programme-in-the-District-of-Hooghly>2025-01-17
-REPAIRING-OF-200-DIA-QUARDRUPED-LEGS-OF-FIRST-DISTRIBUTION-CHAMBER-AND-SPOUT-CHAMBERS-AT-DHANYAGHORI-DHALIGHAT-RLI-SCHEME-UNDER-KHANAKUL-(AGRI-MECH)-SUB-DIVISION-UNDER-CHINSURAH-(A-M)-DIVISION>India -REPAIRING-OF-200-DIA-QUARDRUPED-LEGS-OF-FIRST-DISTRIBUTION-CHAMBER-AND-SPOUT-CHAMBERS-AT-DHANYAGHORI-DHALIGHAT-RLI-SCHEME-UNDER-KHANAKUL-(AGRI-MECH)-SUB-DIVISION-UNDER-CHINSURAH-(A-M)-DIVISION>REPAIRING OF DISTRIBUTION CHAMBER AND SPOUT CHAMBERS AT DHANYAGHORI DHALIGHAT
REPAIRING OF 200 DIA QUARDRUPED LEGS OF FIRST DISTRIBUTION CHAMBER AND SPOUT CHAMBERS AT DHANYAGHORI DHALIGHAT RLI SCHEME UNDER KHANAKUL (AGRI-MECH) SUB-DIVISION UNDER CHINSURAH (A-M) DIVISION
-REPAIRING-OF-200-DIA-QUARDRUPED-LEGS-OF-FIRST-DISTRIBUTION-CHAMBER-AND-SPOUT-CHAMBERS-AT-DHANYAGHORI-DHALIGHAT-RLI-SCHEME-UNDER-KHANAKUL-(AGRI-MECH)-SUB-DIVISION-UNDER-CHINSURAH-(A-M)-DIVISION>2025-01-17
-Maintenance-of-WTA-for-revival-of-Kadipur-State-Own-Major-RLI-Schemes-Under-Champadanga-(A-M)-Sub--Division-under-Chinsurah-(A-M)-Division-due-to-flood-under-Non-Plan-Programme-in-the-District-of-Hooghly>India -Maintenance-of-WTA-for-revival-of-Kadipur-State-Own-Major-RLI-Schemes-Under-Champadanga-(A-M)-Sub--Division-under-Chinsurah-(A-M)-Division-due-to-flood-under-Non-Plan-Programme-in-the-District-of-Hooghly>Maintenance of WTA for revival of Kadipur
Maintenance of WTA for revival of Kadipur State Own Major RLI Schemes Under Champadanga (A-M) Sub- Division under Chinsurah (A-M) Division due to flood under Non-Plan Programme in the District of Hooghly
-Maintenance-of-WTA-for-revival-of-Kadipur-State-Own-Major-RLI-Schemes-Under-Champadanga-(A-M)-Sub--Division-under-Chinsurah-(A-M)-Division-due-to-flood-under-Non-Plan-Programme-in-the-District-of-Hooghly>2025-01-17
India Supply Of Cricket Bat (q3), Field Hockey Sticks As Per Is 829 (q3), Football (q3), Basketball Ring (q3), Volleyballs As Per Is 417:1986 (q3), Football Shoes (q3), Handball (v2) (q3), Cricket Stumps Bails (q3), Cricket Ball (q3), Shot Put - Athletics (q3), 2025-01-17
qty:8
>India
qty:8
>Supply Of Bush (tilt Cylinder) 195-63-52622/125-hc-11443
qty:8
qty:8
>2025-01-17
India Supply Of Beml Dozer Spares - Magnetic Plug, Cap, Pressure Valve, O-ring, Gasket Joint Bolt, Joint, Tube Assembly, Nipple, Strainer, Gasket, Hose, Nipple, Overflow Tube, Oil Seal, Tube, Hose Assembly, Filter Element Assembly, Bearing Seal, Relief Control 2025-01-17
India Supply Of Nylon Conveyor Belt 650 Mm Wide, Nn500-3, Nylon Conveyor Belt 650 Mm Wide, Nn630-4, Nylon Conveyor Belt 900mm Wide, Nn250, Nylon Conveyor Belt 1050mm Wide Nn150, Nylon Conveyor Belt 1050mm Wide Nn250, Nylon Conveyor Belt 1200mm Wide Nn250, Nylon 2025-01-17
India Design Construction Testing and Commissioning of Intake Well along with ancillary structures civil work all EMI works including pumping station piping system electrical system and PLC SCADA and automation etc at River Mahanadi for WS to Gajamara IA 2025-01-17
-Operation-of-Chemical-Dosing-system,-Fountain-system-at-Kalyaneswari-Water-Treatment-Plant-under-RCFA-Part---I-Water-Supply-Scheme.>India -Operation-of-Chemical-Dosing-system,-Fountain-system-at-Kalyaneswari-Water-Treatment-Plant-under-RCFA-Part---I-Water-Supply-Scheme.>WBPHED/EE/AMD/ NIeT-40 of 2024-2025/1
Operation of Chemical Dosing system, Fountain system at Kalyaneswari Water Treatment Plant under RCFA Part - I Water Supply Scheme.
-Operation-of-Chemical-Dosing-system,-Fountain-system-at-Kalyaneswari-Water-Treatment-Plant-under-RCFA-Part---I-Water-Supply-Scheme.>2025-01-17
-Operation-and-Maintenance-of-Low-Lift-Pumping-Machineries-and-other-Electrical-Installations-at-Narayankuri-Pump-House-under-Narayankuri-Water-Supply-Scheme.>India -Operation-and-Maintenance-of-Low-Lift-Pumping-Machineries-and-other-Electrical-Installations-at-Narayankuri-Pump-House-under-Narayankuri-Water-Supply-Scheme.>WBPHED/EE/AMD/ NIeT-40 of 2024-2025/10
Operation and Maintenance of Low Lift Pumping Machineries and other Electrical Installations at Narayankuri Pump House under Narayankuri Water Supply Scheme.
-Operation-and-Maintenance-of-Low-Lift-Pumping-Machineries-and-other-Electrical-Installations-at-Narayankuri-Pump-House-under-Narayankuri-Water-Supply-Scheme.>2025-01-17
Whats app