Filter Search


Asia


Location Summary Deadline
India Interconnection On Newly Sank Deep Tubewell At Lichubagan With Existing Distribution Main Along With Allied Works Like Pump Base, Valve With Valve Chamber, Wash Out Chamber With Drain Etc Under Sankrail Zone. 2026-02-09
Bangladesh Maintenance Work For Double Cabin Pick-up Sirajgonj-tha-11-0038 2026-02-09
-For-The-Paint-And-Snowcem-Work-At-Rb-Nrb-Buildings-And-For-Repair-And-Reconstruction-Of-Damaged-Wall-Of-Control-Room-Back-Side,-Hap-Hut-Side-Wall-Etc-At-220kv-Substation-Bbmb-Ch-Dadri>India -For-The-Paint-And-Snowcem-Work-At-Rb-Nrb-Buildings-And-For-Repair-And-Reconstruction-Of-Damaged-Wall-Of-Control-Room-Back-Side,-Hap-Hut-Side-Wall-Etc-At-220kv-Substation-Bbmb-Ch-Dadri>Enit 09/ O M Bwn/2025-26
For The Paint And Snowcem Work At Rb Nrb Buildings And For Repair And Reconstruction Of Damaged Wall Of Control Room Back Side, Hap Hut Side Wall Etc At 220kv Substation Bbmb Ch Dadri
-For-The-Paint-And-Snowcem-Work-At-Rb-Nrb-Buildings-And-For-Repair-And-Reconstruction-Of-Damaged-Wall-Of-Control-Room-Back-Side,-Hap-Hut-Side-Wall-Etc-At-220kv-Substation-Bbmb-Ch-Dadri>2026-02-09
Nepal Construction Of Canal And Canal Related Structures Of Ramghatar Ip, Madyanepal- 2,3,4, Lamjung 2026-02-09
Nepal Construction Of Embankment With Launching And Sloping, Sanfebagar-2, Achham 2026-02-09
Nepal Construction Of Canal And Canal Structures, Aalital-2, Dadeldhura 2026-02-09
Nepal Construction Of Gabion Revetment Wall And Plum Concrete, Parshuram Municipality-4, Dadeldhura 2026-02-09
Nepal Construction Of Canal And Canal Structures, Ganyapdhura-3, Dadeldhura 2026-02-09
Nepal Construction Of Sallaganesh Pokhari 2026-02-09
Nepal Construction Of Gabion Revetment Wall, Sanfebagar-4, Achham 2026-02-09
Whats app