Filter Search


Asia


Location Summary Deadline
India Supply Of Thumb Switches With Two Normally Open And Two Normally Closed Contacts, Rated For 10 Amps And In Black Color. The Switches Should Be Sourced From Specified Manufacturers. Thumb Switch 2no-2nc, 10 Amps, Black 2026-02-09
India "auxiliary Reservoir Suspension Strap As Per Rdso Drawing No. Wd-09034-s- 20, Alt. 06, Item No. 01." .#* "auxiliary Reservoir Suspension Strap As Per Rdso Drawing No. Wd-09034-s-20, Alt. 06, item No. 01." [ Warranty Period: 30 Months After The Date Of Del 2026-02-09
India Ami No.16.64/2026-27 Inj Pembrolizumab 100mg .#* Ami No.16.64/2026-27 Inj Pembrolizumab 100mg [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 Lacs ] ] 2026-02-09
India Poh Kit For Distributor Value .#* Poh Kit For Distributor Valve Type C3w 43 Items As Per Annexure Atached [ Warranty P eriod: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation perm 2026-02-09
India Sealed Maintenance Free Valve Regulated Lead Acid Battery .#* Sealed Maintenance Free Valve Regulated Lead Acid Battery (vrla) 1100 Ah Capacity C onfirming To Rdso Specification No: Rdso/pe/spec/ac/0009-2014 (rev. 2). Per Set Of 56 Cells With Int er Cell 2026-02-09
India The Project Involves The Manufacture And Supply Of Wider Pre-stressed Concrete Sleepers Designed For A 25-ton Axle Load. These Sleepers Are Intended For Use With 60 Kg And 52 Kg Running Rails And Guard Rails, Specifically For Ballasted Deck Bridges, Adher 2026-02-09
India Bus 38 Seater .#* Bus 38 Seater (38+d Fbv) As Per Attached Document & Conditions As Below:- 1. Comple te Tool Box Must Be Provided. 2. Fleet Edge Telematics, Fuel Monitoring System, Mechanical Suspende d Seat For Driver, Cruise Control, Gateway Domain Con 2026-02-09
India Construction Of Covered Rcc Drain In Allahpur Saidikhel Haneef. Construction Of Covered Rcc Drain. 2026-02-09
-Covered-Rcc-Drain-Construction>India -Covered-Rcc-Drain-Construction>Allahpur Saidikhel Ishwer Marriage Lawn Covered Rcc Drain Construction
Covered Rcc Drain Construction
-Covered-Rcc-Drain-Construction>2026-02-09
India Rate Contract For Manufacturing And Supply Of Pre Stressed Mono-block Concrete sleeper (pretensioned Type Thick Web Switch Expansion Joint (rdso Drg. No. T-8838) sleepers ) .#* Rate Contract For Manufacturing And Supply Of Pre Stressed Mono-block Concrete 2026-02-09
Whats app