Filter Search


Asia


Location Summary Deadline
Bangladesh Improvement Of Different Lane By Lane At Mirpur Section-11, Block C Under Ward No 3. Idrisp: Package W-04 2025-01-13
Bangladesh Improvement & Construction Of Drainage System At Service Passages Under Ward No 6. Idrisp: Package-w-42 2025-01-13
Bangladesh Construction Of 40.974m 1x39.634 Long P.c Girder Baramasua Bridge At 30th Km Ch:29+867m Of Barguna Dhakin Ramna Kheyaghat -dawatala-mathbaria-baromasua Z-8814 Pirojpur Part Road Under Pirojpur Road Division During The Year 2023 -2024. 2025-01-13
Turkey Fuel Will Be Purchased 2025-01-13
India Supply And Installation Of Equipment For Tccc Radiation Oncology Rims, Ranchi -list Of Medical Equipment For Tccc Oncology Rims , High -engergy Linear Accelerator With Igrt And Site Modification With Five Years Comprehensive Unconditional Warranty Includi 2025-01-13
India Collection, Transportation And Processing Of Municipal Solid Waste (segregated Into 4 Categories As Per Swacch Survekshan Protocols), Collection Of User Charges And Faecal Sludge Management 2025-01-13
India Development Of Passenger Ropeway Project At Jatashankar Dham Temple, Distt. Chhatarpur In The State Of Mp Through Ppp Dbfot Mode. 2025-01-13
-Construction,installation,maintenance-Of-7nos-Dug-Well-Along-With-Solarwater-Pump-I.e.-Polashban(392),gohaliara(239),gohaliara(218),gohaliara(298),gohaliara(1538),gohaliara(1493),gohaliara(129)>India -Construction,installation,maintenance-Of-7nos-Dug-Well-Along-With-Solarwater-Pump-I.e.-Polashban(392),gohaliara(239),gohaliara(218),gohaliara(298),gohaliara(1538),gohaliara(1493),gohaliara(129)>Construction Of 7nos Pump Dug Well In Birbhum District
Construction,installation,maintenance Of 7nos Dug Well Along With Solarwater Pump I.e. Polashban(392),gohaliara(239),gohaliara(218),gohaliara(298),gohaliara(1538),gohaliara(1493),gohaliara(129)
-Construction,installation,maintenance-Of-7nos-Dug-Well-Along-With-Solarwater-Pump-I.e.-Polashban(392),gohaliara(239),gohaliara(218),gohaliara(298),gohaliara(1538),gohaliara(1493),gohaliara(129)>2025-01-13
India Development Of Airborne Retractable Mechanism For Stabilized Eo/ir Payload 2025-01-13
India Construction Of 01 No. 33 Kv Ais Transfar Bay At 220 Kv Hybrid Sub-station Hapur Under Etd Hapur 2025-01-13
Whats app