Filter Search


Asia


Location Summary Deadline
Japan Gas To Be Consumed At Courthouse Of Tokyo District Court Civil Enforcement Center Building And 4 Other Buildings ; ?tokyo District Court Civil Enforcement Center Building : Estimated Annual Consumption 42,600 Cubic Meters ?intellectual Property ... 2025-06-21
Japan Fy2024 Digital Land Mobile Communication Equipment (takase Station, Etc.) Complete Manufacturing (electronic Bidding Target Project) (electronic Contract Target Project) 2025-06-21
Japan Purchase Of Electricity For Use At Two Locations Outside The Main Building Of The Civil Engineering Research Institute For Cold Region (unit Price Contract) 2025-06-21
Japan Robotic-assisted Surgery System For Bph 1 Set 2025-06-21
Japan Crsa System Operation And Maintenance Work For Fiscal Year 2025 2025-06-21
Japan Purchase Of A License To Create Tailored Flight Verification Data For Textron Aviations 525c Aircraft, And One Other Item. 2025-06-21
Japan Maintenance And Operation Of "gbizid Infrastructure", 1 Set 2025-06-21
Japan Detailed Design And Verification Tests Of Iter Shield Block Rh Welding Tools, 1 Set 2025-06-21
Japan A Set Of Research And Studies Aimed At Revising Standard Specifications For Information Systems (welfare For The Disabled) In Local Governments 2025-06-21
Japan Procurement Of Electricity For Use At Akita Hospital (ac 3-phase 3-wire, Supply Voltage 6,000 Volts) Contract Power 600 (kw) Planned Annual Power Consumption 2,185,920 (kwh) 2025-06-21
Whats app