Filter Search


Asia


Location Summary Deadline
Bangladesh Carrying Of Different Allotted Materials From Electrical Equipment Directorate Of Bpdb, Carring Of Spc Pole From Pc Pole Factory, Carring Of Faulty & Repair Transformer From Cers/zrs For Financial Year 2024-2025 Revenue For Chief Engineer Distribution Ce 2025-01-22
India Construction Of Knowledge Center Cum Meeting Room, Lounge Facility With Wash Cum Toilet & Sale Counter With Co-compost Shed Under Fstp 2.0 For Rambha. 2025-01-22
-Improvement-To-Gotalgram-Distributary-From-Rd.-1.50-Km-To-2.020-Km-And-Bad>India -Improvement-To-Gotalgram-Distributary-From-Rd.-1.50-Km-To-2.020-Km-And-Bad>Construction Of Trough Wall Of Manijanga Minor From Rd. 00 To 560 Mtr Construction Of Trough Wall Over Nbc From Rd.49.500 Km To 49.700 Km" (near Tinimuhani) (near Linimunant)
Improvement To Gotalgram Distributary From Rd. 1.50 Km To 2.020 Km And Bad
-Improvement-To-Gotalgram-Distributary-From-Rd.-1.50-Km-To-2.020-Km-And-Bad>2025-01-22
India Construction For Bituminous Road And Washing & Cleaning Of Existing Pipe Line 2025-01-22
qty:6
>India
qty:6
>Supply Of Operation Of Ems 1st Month, Operation Of Ems 2nd Month, Operation Of Ems 3rd Month, Operation Of Ems 4th Month, Operation Of Ems 5th Month, Operation Of Ems 6th Month
qty:6
qty:6
>2025-01-22
qty:1024140
>India
qty:1024140
>Supply Of Whole Wheat Flour (atta) (v2) (defence) (q2), Suji For Defence (q3), Refined Wheat Flour (maida) (v2) (defence) (q2), Dalia For Defence (q3)
qty:1024140
qty:1024140
>2025-01-22
India Ward No 04 Const Of Rcc Drain Work Amit Thakur To Lallu Yadav Home And Diffrent Street Place 2025-01-22
India Ward No 04 Const Of Rcc Drain Work At Omkar Rajak To Samaiya And Sukhram Litoriya 2025-01-22
India Const Of Cc Road Work At Pradeep Yadav To Shilendra Thakur 2025-01-22
-Construction-Of-Rest-Hall-Fordevotees-In-Arulmigu-Renugambal-Thirukkoil-At-A.k.padavedu-In-Polur-Taluk-Of-Tiruvannamalai-District>India -Construction-Of-Rest-Hall-Fordevotees-In-Arulmigu-Renugambal-Thirukkoil-At-A.k.padavedu-In-Polur-Taluk-Of-Tiruvannamalai-District>Construction Of Rest Hall Fordevotees In Arulmigu Renugambal Thirukkoil At A.k.padavedu
Construction Of Rest Hall Fordevotees In Arulmigu Renugambal Thirukkoil At A.k.padavedu In Polur Taluk Of Tiruvannamalai District
-Construction-Of-Rest-Hall-Fordevotees-In-Arulmigu-Renugambal-Thirukkoil-At-A.k.padavedu-In-Polur-Taluk-Of-Tiruvannamalai-District>2025-01-22
Whats app