Filter Search


Asia


Location Summary Deadline
India Actuating Sleeve (for Slack Adjuster Type Irsa-600) .#* Actuating Sleeve (for Slack Adjuster Type Irsa-600) . Drawing No :- Wd -82064 -s -06 -r c, Alt. 4, Item No. 1 Spec. No:-07-abr-92, Amend. No. 5. [quantity Tolerance (+/-): 5 %age , Item Category : No 2025-12-29
India Switch Fuse Unit, Rated Current 30/32 Amps .#* Switch Fuse Unit, Rated Current 30/32 Amps, Three Phase, Triple Pole, With Ne utral Link, Weather Proof, Metal Clad, Air Brake, Degree Of Protection Shall Be Ip 2l3 As per Is/iec 60947(part-1/2004) & Is/iec 6 2025-12-29
India C2w Relay Valve With 5mm Choke As Per Wabco Drg. 579991 & Spec. T- 3439-0 .#* C2w Relay Valve With 5mm Choke As Per Wabco Drg. 579991 & Spec. T-3439-0 [ warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Categ 2025-12-29
India Grab Handle For Icf- Emu Trailer Coaches. .#* Grab Handle For Icf- Emu Trailer Coaches. Rdsos Drg.no. Cg-12064 Alt "nil" Con sisting Of Items No.1,2,3,4,5,6,7,11,12 & 13 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 2025-12-29
India Construction Of Retaining Wall From Tonca Bridge To Chowdar, Tonca Waddo At V.p. St. Estevam In Cumbharjua Constituency.(re-tender) 2025-12-29
Thailand Procurement Plan: Expanding The Area, Increasing The Size Of The Ban Nong Sai Pot, Udon Land, Nong Na Kham Subdistrict, Mueang District, Udon Thani Province c-67-d-ud2cs.0498.01.1 Expanding The Area, Increasing The Size Of The Ban Nong Sai Pot, Udon Land, 2025-12-29
India Cap. / Tab. Gabapentin 300 Mg + Methylcobalamine 500 Mcg .#* Cap. / Tab. Gabapentin 300 Mg + Methylcobalamine 500 Mcg Per Unit (item No. 1780 of Ami 2025-26) [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: 2025-12-29
India Construction Of Pcc Road From Galundi Saranan Ghosh House To Babu Pal House 2025-12-29
India Installation Lever Assembly .#* Installation Lever Assembly With Ball And Socket Ends To Rdso Sketch - K1050 Alt.4 And To rdso Specn. C-k407 (rev.4) Of Air Suspension Control Equipment For Air Spring Assembly System For Lh b Coaches. Note Material To Be P 2025-12-29
India Modernization Of Rural Link Roads Under Special Assistance To States Including 5 Year Routine Maintenance In Mc Patran, District Patiala Group 1 2025-12-29
Whats app