Filter Search


Asia


Location Summary Deadline
India Compressed Oxygen Gas & Dissolved Acetylene Gas .#* Compressed Oxygen Gas To Is:309/2023 (fifth Revision) Hsn Code-28044090. [ Warra nty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po V 2026-03-09
Bangladesh Supply Of Lot 2: Supply Of 250 Kva 11/0.4 Kv Distribution Transformer For Fauzderhat Store 2026-03-09
Saudi Arabia Establishment, Operation And Management Of Agricultural Nursery No. 9 In Al-hadary Neighborhood - Agricultural And Animal Activities - Food Agricultural Activities And Services - Nursery 2026-03-09
India Construction Of Rcc Drain From Ravendra Dev Pandey House To Tali Main Road At Ward No 40 2026-03-09
Saudi Arabia Restoration, Operation, And Maintenance Of An Existing Multi-use Building In Al-nusbah (suitable For Individual Accommodation) 2026-03-09
Nepal Construction Of Sambhu Sunanda Ma.bi. Swamikartik Ga.pa. 03, Jukot, Bajura And Kalika Aadharbhut Bidhyalya Swamikartik Ga.pa. 02, Bajura. 2026-03-09
Nepal Construction Works Of Kathmandu District Tarakeshwor Municipality Ward No. 9 Manamaiju Old Settlement Inside Road Construction 2026-03-09
India Flexible Conduit Pipe .#* Polyamide (pa-6) Flexible Conduit Pipe Of Nominal Size Nw 12 (od 15.8+0.2 Mm) As Per Rds os Spec. No. Rdso/pe/spec/ac/0138-2009, Rev-1 For Tmdds Modification In Electric Locomotives. [ Warra nty Period: 30 Months After The Date O 2026-03-09
Japan Maintenance Of Safety Analysis Systems For Fast Reactors, 1 Set, And 15 Other Contracts 2026-03-09
India Rfp (request For Proposal) For Procurement Of Mini Water Tender With Mist Technology 2026-03-09
Whats app