Filter Search


Asia


Location Summary Deadline
-Design,-Fabrication,-Supplying,-Installation,-Commissioning-Trial-Run-Of-30-Cum/-Hr.-Capacity-Of-Iron-Elimination-Plant-(iep)-As-Per-Phed-Approved-Model-(pressure-Type)-Including-1-(one)-No.-Compressor-Room,-Sludge-Dispo>India -Design,-Fabrication,-Supplying,-Installation,-Commissioning-Trial-Run-Of-30-Cum/-Hr.-Capacity-Of-Iron-Elimination-Plant-(iep)-As-Per-Phed-Approved-Model-(pressure-Type)-Including-1-(one)-No.-Compressor-Room,-Sludge-Dispo>Wbphed/ee/msd/13 Of24-25sl13
Design, Fabrication, Supplying, Installation, Commissioning Trial Run Of 30 Cum/ Hr. Capacity Of Iron Elimination Plant (iep) As Per Phed Approved Model (pressure Type) Including 1 (one) No. Compressor Room, Sludge Dispo
-Design,-Fabrication,-Supplying,-Installation,-Commissioning-Trial-Run-Of-30-Cum/-Hr.-Capacity-Of-Iron-Elimination-Plant-(iep)-As-Per-Phed-Approved-Model-(pressure-Type)-Including-1-(one)-No.-Compressor-Room,-Sludge-Dispo>2025-03-03
-Triple-Valve-Stabilising-Valve-Complete-For-Wsf-Type-Ep-Brake-Unit-Of-Emu-Specification-M/s-Wsf-Part-No.-B77714/1.-[-Warrant>India -Triple-Valve-Stabilising-Valve-Complete-For-Wsf-Type-Ep-Brake-Unit-Of-Emu-Specification-M/s-Wsf-Part-No.-B77714/1.-[-Warrant>Supply Of Triple Valve Stabilising Valve Complete For Wsf Type Ep Brake Unit Of Emu Specification M/s Wsf Part No. B77714/1.
Triple Valve Stabilising Valve Complete For Wsf Type Ep Brake Unit Of Emu Specification M/s Wsf Part No. B77714/1. [ Warrant
-Triple-Valve-Stabilising-Valve-Complete-For-Wsf-Type-Ep-Brake-Unit-Of-Emu-Specification-M/s-Wsf-Part-No.-B77714/1.-[-Warrant>2025-03-03
India Construction Of Thozhi Working Women's Hostel Building With Development Works For 50 Persons. 2025-03-03
India Supply Of Drinking Water Various Wards In Karnawad Through Tanker Capacity 5000 Liter Only Water From Bidders Water Source Rate Per Tanker 2025-03-03
Kuwait Consumables Used In Arthroscopic Orthopedic Surgery For Farwaniya Hospital 2025-03-03
India Quotation For Hiring Of Vehicles On Monthly Rent Basis 2025-03-03
Bangladesh Construction Of Rigid Pavement At 1st Km P And Partial Strengthening With Dbs Wearing Course Overlay At 1st Km P To 10th Km P & 20th Km To 23rd Km P Of Sonaimuri-senbag-kallandi Road Z-1421 Under Noakhali Road Division During The Year 2024-202 2025-03-03
Japan Complete Set Of Updating The Human Trafficking Database System 2025-03-03
-Design,-Fabrication,-Supplying,-Installation,-Commissioning-Trial-Run-Of-50-Cum/-Hr.-Capacity-Of-Iron-Elimination-Plant-(iep)-As-Per-Phed-Approved-Model-(pressure-Type)-Including-1-(one)-No.-Compressor-Room,-Sludge-Dispos>India -Design,-Fabrication,-Supplying,-Installation,-Commissioning-Trial-Run-Of-50-Cum/-Hr.-Capacity-Of-Iron-Elimination-Plant-(iep)-As-Per-Phed-Approved-Model-(pressure-Type)-Including-1-(one)-No.-Compressor-Room,-Sludge-Dispos>Wbphed/ee/msd/13 Of24-25sl2
Design, Fabrication, Supplying, Installation, Commissioning Trial Run Of 50 Cum/ Hr. Capacity Of Iron Elimination Plant (iep) As Per Phed Approved Model (pressure Type) Including 1 (one) No. Compressor Room, Sludge Dispos
-Design,-Fabrication,-Supplying,-Installation,-Commissioning-Trial-Run-Of-50-Cum/-Hr.-Capacity-Of-Iron-Elimination-Plant-(iep)-As-Per-Phed-Approved-Model-(pressure-Type)-Including-1-(one)-No.-Compressor-Room,-Sludge-Dispos>2025-03-03
Yemen Tender Are Invited For Supply Of Spare Parts For The Maintenance Of Oil And Fuel Filters For Haiz Power Plant 2025-03-03
Whats app