Filter Search


Asia


Location Summary Deadline
India Power Brush Cutter (grass Cutter). .#* Power Brush Cutter (grass Cutter) Machine As Per The Technical Specification Uploaded As An nexure-a. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Norm 2025-12-25
-Installation-Of-One-Solar-Submersible-And-Tank-For-Drinking-Water-Near-Kalitala-Of-Ghosalpara-At-Sonai-Village>India -Installation-Of-One-Solar-Submersible-And-Tank-For-Drinking-Water-Near-Kalitala-Of-Ghosalpara-At-Sonai-Village>78 2nd Call
Installation Of One Solar Submersible And Tank For Drinking Water Near Kalitala Of Ghosalpara At Sonai Village
-Installation-Of-One-Solar-Submersible-And-Tank-For-Drinking-Water-Near-Kalitala-Of-Ghosalpara-At-Sonai-Village>2025-12-25
-Construction-Of-Pucca-Drain-With-Cover-From-The-House-Of-Shailen-Kole-To-Nibaran-Kole-At-Kamalapur-Paschimpara>India -Construction-Of-Pucca-Drain-With-Cover-From-The-House-Of-Shailen-Kole-To-Nibaran-Kole-At-Kamalapur-Paschimpara>613/15thfc(tied)/bpgp/25 Sl 15
Construction Of Pucca Drain With Cover From The House Of Shailen Kole To Nibaran Kole At Kamalapur Paschimpara
-Construction-Of-Pucca-Drain-With-Cover-From-The-House-Of-Shailen-Kole-To-Nibaran-Kole-At-Kamalapur-Paschimpara>2025-12-25
Kazakhstan Public Procurement Of Works 2025-12-25
India Repairing And Upgradation Of Road From Pond Of Ismail Jamader To Kabarsthan At Paschim Dhola. (apas/01/133/161/0002) 2025-12-25
India Construction Of Cc Road From Pmgsy Road To H/o Subhas Lodh At Haripukuria Under Fatepur Gram Panchayat 2025-12-25
India Construction Of Cc Road From Kusthapally To Bhuiyan Para, Ward No.-59, Borough-vlll, Under A.m.c. (booth No. -116,282-kulti) 2025-12-25
India Construction Of Shed At Jama Mosjid 2025-12-25
-6-Nos-Tube-Well-With-Soak-Pit-At-Pahalampur-Mouza.>India -6-Nos-Tube-Well-With-Soak-Pit-At-Pahalampur-Mouza.>613/15thfc(tied)/bpgp/25 Sl 06
6 Nos Tube Well With Soak Pit At Pahalampur Mouza.
-6-Nos-Tube-Well-With-Soak-Pit-At-Pahalampur-Mouza.>2025-12-25
-Estimate-For-Swm-Projects-Boundary-Wall-At-Chak-Pahalampur>India -Estimate-For-Swm-Projects-Boundary-Wall-At-Chak-Pahalampur>614/15thfc(un-tied)/bpgp/25 Sl N0- 10
Estimate For Swm Projects Boundary Wall At Chak Pahalampur
-Estimate-For-Swm-Projects-Boundary-Wall-At-Chak-Pahalampur>2025-12-25
Whats app