Filter Search


Asia


Location Summary Deadline
Nepal Construction Of Sahid Mangtok Road At Chulachuli 1 Ilam 2025-12-26
-Construction-Of-Concrete-Road-From-Raju-Roy-House-Towards-Pratap-Dhara-House-()-120-People-Benefitted>India -Construction-Of-Concrete-Road-From-Raju-Roy-House-Towards-Pratap-Dhara-House-()-120-People-Benefitted>Construction Of Concrete Road From Raju Roy House Towards Pratap Dhara House 120 People Benefitted
Construction Of Concrete Road From Raju Roy House Towards Pratap Dhara House () 120 People Benefitted
-Construction-Of-Concrete-Road-From-Raju-Roy-House-Towards-Pratap-Dhara-House-()-120-People-Benefitted>2025-12-26
India Construction Work Of Cc/apex/drain From The House Of Shri Chandan Pal Towards Futisair Tigaila In Village Sunauri Of Talbehat Development Block Of Lalitpur Vidhan Sabha, District Lalitpur. 2025-12-26
India Providing Driver For Driving Departmental Vehicle Of Reg No. Wb-73b-7825 Under Cmsd, Phe Dte.in The Dist Of Coochbehar. 2025-12-26
-Cleaning-Of-The-All-The-Overhead-And-Under-Ground-Water-Resiorviors-Of-P-G-Men-Student-Hall-1no-Vidrasagar-St,-Ug-Lady-Student-Hall-17-No-Radha-Nath-Boselane-Once-In-Every-Two-Months-Followed-By-Testing-Through-Out-Year,>India -Cleaning-Of-The-All-The-Overhead-And-Under-Ground-Water-Resiorviors-Of-P-G-Men-Student-Hall-1no-Vidrasagar-St,-Ug-Lady-Student-Hall-17-No-Radha-Nath-Boselane-Once-In-Every-Two-Months-Followed-By-Testing-Through-Out-Year,>E-tender/eng/cq- 373 /25-26
Cleaning Of The All The Overhead And Under Ground Water Resiorviors Of P G Men Student Hall 1no Vidrasagar St, Ug Lady Student Hall 17 No Radha Nath Boselane Once In Every Two Months Followed By Testing Through Out Year,
-Cleaning-Of-The-All-The-Overhead-And-Under-Ground-Water-Resiorviors-Of-P-G-Men-Student-Hall-1no-Vidrasagar-St,-Ug-Lady-Student-Hall-17-No-Radha-Nath-Boselane-Once-In-Every-Two-Months-Followed-By-Testing-Through-Out-Year,>2025-12-26
-Installation-Of-52-Nos.-Led-Street-Light-At-All-Area-Of-Uttar-Harishpur-98-No.-Booth.>India -Installation-Of-52-Nos.-Led-Street-Light-At-All-Area-Of-Uttar-Harishpur-98-No.-Booth.>Installation Of 40 Nos. Led Street Light In Electric Post At All Area Of 152 No. Booth.
Installation Of 52 Nos. Led Street Light At All Area Of Uttar Harishpur 98 No. Booth.
-Installation-Of-52-Nos.-Led-Street-Light-At-All-Area-Of-Uttar-Harishpur-98-No.-Booth.>2025-12-26
India A. Construction Of Chulli Shade At Nayachak Samsan (sanko Gora). B. Construction Of Cc Road From Panchanan Maji House To Pwd Road And 90 Ft. (approx) Tally Piling At Bali Pukur. C. Construction Of 300 Ft. (approx) Cc Road With 80 Ft. Tally Piling In 2025-12-26
India Reparing Of Road From Swapan Das House To Kali Mandir Under Apas Fund Under Sutahata Development Block 2025-12-26
India Construction Of C.c. Road From Pmgsy Road To Rabi Singha House At Dohaguri Sansad Sansad 27/27 Under Raniganj Panishali Gp Within Kharibar Block Dev Under Apas Fund 2025-12-26
India Led Mini Highmast Light At Chakchandinagar Cementry At Ps 162 Under Haripal Ashutosh Gp Within Haripal Development Block 2025-12-26
Whats app