Filter Search


Asia


Location Summary Deadline
India Hex Head Bolt. .#* Hex Head Bolt M20 X 220 High Tensile As Per Drawing Is:1364 (part-1)-1992,8.8 alongwith Its Nut & Washer. It Should Be As Per Rdso Approved Specfication & Make I.e U nbrako, Tvs, Tuff.or Equivalents [ Warranty Period: 30 Months After Th 2026-03-09
India Auction Of Under Construction Residential Flat No - 203 Residential Flat No - 203 2026-03-09
India Cc Overlay At Sai Baba Residency Phase 2 W 02, Z-20 2026-03-09
Malaysia Gross Pollution Trap Gpt And Mini Gpt Maintenance Works, In Putrajaya Federal Territory For A Period Of 24 Months. 2026-03-09
Qatar Upgradation Of Unloading/loading Sequence Of Recycle And Makeup Gas Compressor At Qatarenergy Refinery, Mesaieed. 2026-03-09
Japan Installation, Rental And Maintenance Of Telephone Related Equipment In Osaka Regional Taxation Bureau Office Of Submission Processing Center (otsu) And Other 3 Center Etc, (from Group 1 Through Group 4), 1 Set 2026-03-09
India Locking Arrangement Of Uncoupling Rod. As Per Drg. No. Wd-00046-s-01, Alt. 07. .#* Locking Arrangement Of Uncoupling Rod. As Per Drg. No. Wd-00046-s-01, Alt. 07. [ Warr anty Period: 30 Months After The Date Of Delivery ] ] 2026-03-09
Nepal Construction Of A Building For Autism Special School In Budhanilkantha -06, Kathmandu 2026-03-09
India Set Of Hex Head Screws .#* Set Of Hex Head Screws (i) M16x60 Qty. -4 Nos, (ii) M10x25 Qty.- 8 Nos, (iii) M24x10 0 Qty.- 8 Nos. & (iv) M16x50 Qty.-4 Nos, High Tensile. Material & Specification : Is:1364(part-2)- 2023, Or Latest, Ce-with Property Class-10.9 2026-03-09
Japan Noetsu Expressway Koshinohara Bridge Restoration (superstructure) No. 2 (fy2026-2028) And Kurinoki Road Kurinoki Viaduct Superstructure Construction No. 3 2026-03-09
Whats app