Filter Search


Asia


Location Summary Deadline
Nepal Upgrading Of Road From Shanti Maidan - Khadka Gau - Deumadi, Pmc - 28 (contract Id: 71/pmc/ncb/w/purbadhar/082-83) 2026-03-09
India Supply, Installation & Commissioning .#* Supply, Installation & Commissioning Of 3 Phase , 4 Wire Ac Feeder Contactor & Auxiliary Con tactor 3 Phase, Test Bench. Input 3 Phase ,415v , 10a , 50 Hz Ac. Detailed Specifications Attached In Annex ure -a [ Warr 2026-03-09
India Re-auction Of Assets For Sale Of Industrial Land And Factory Building Industrial Land, Factory Building 2026-03-09
-Work-Of-Repair-And-Maintenance-Of-Septic-Tank-As-Per-Schedule-At-Rajghat-Hps-Mppgcl-Chanderi>India -Work-Of-Repair-And-Maintenance-Of-Septic-Tank-As-Per-Schedule-At-Rajghat-Hps-Mppgcl-Chanderi>Work Of Repair And Maintenance Of Septic Tank As Per Schedule
Work Of Repair And Maintenance Of Septic Tank As Per Schedule At Rajghat Hps Mppgcl Chanderi
-Work-Of-Repair-And-Maintenance-Of-Septic-Tank-As-Per-Schedule-At-Rajghat-Hps-Mppgcl-Chanderi>2026-03-09
India Body Side Door Assembly (r.h.). .#* Body Side Door Assembly (r.h.) To Icf Drg. No. T-5-1-672 Alt.-x/18, Col.-ii. Matl.&spec. As P er Drg. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal 2026-03-09
India Washer 3 Mm .#* Washer 3 Mm Confirming To Kbi Part No. C-162060 And Rdso Spec. No. Wd-23-bmbs-2008 rev.1 Amndt.1 Of Sept.2016 [ Warranty Period: 36 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po V 2026-03-09
Kuwait Event_67737 - Rfq#2156337_supply Of Positive & Adjustable Chokes - 3m & 5m 2026-03-09
India Double Check Valve 3/4" For E-70 Brake System .#* Double Check Valve 3/4" For E-70 Brake System As Per Ftrtipl Pt. No.-00200750 0. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total 2026-03-09
India Ohe Modification Work And Other Allied Work At Miyagam Karjan And Nearby Station in Connection With Increasing Csr Of Loop Line. 2026-03-09
Nepal Upgrading Of Suryabasti Road , Sunwal-13. ,nawalparasi, Ridonaw/134/ncb/082-83/37 2026-03-09
Whats app