Filter Search


Asia


Location Summary Deadline
India Supply Of Modified Locking Arrangements For Window Glass Shutters Used In Three-phase Locomotives, Including Components Such As Locking Assemblies, Gaskets, Stainless Steel Bolts, Nuts, And Washers. Set Of Modified Locking Arrangement 2026-03-09
-Sell-For-Shop-No-02-Naursinggarh-Road-Near-Sulabh-Complex-At-Berasia>India -Sell-For-Shop-No-02-Naursinggarh-Road-Near-Sulabh-Complex-At-Berasia>Sell For Shop No 02
Sell For Shop No 02 Naursinggarh Road Near Sulabh Complex At Berasia
-Sell-For-Shop-No-02-Naursinggarh-Road-Near-Sulabh-Complex-At-Berasia>2026-03-09
India Carriage Of Condemned Wheelsets From Raipur To Rail Wheel Factory, Yelahanka, bengaluru,karnataka- 560064, By Road:distance Slab:1355km. Loading And unloading By Railways At Free Of Cost. Quantity:150 Mt. Special Note: (1) tenderers Should Quote The Rates 2026-03-09
India Shifting/modification Work Of 220 Kv And 66/33 Kv Eht Underground Cables Of Dtl, Tpddl, Dmrc, Ndmc Etc. Infringing Between Chainage (00000-35200) Of Delhi-panipat-karnal Namo Bharat Corridor. 2026-03-09
India Procurement Of Channel For Cross Bearer To Rcf Drg No.cc11205, Alt.nil. .#* Channel For Cross Bearer To Rcf Drg No.cc11205, Alt.nil. [ Warranty Period: 30 Mon hs After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Tot 2026-03-09
India Supply Of Auxiliary Helical Springs Designed For Ng Coaches, Adhering To Specific Drawings And Specifications. The Springs Are Intended For Use In Railway Coaching Stock, Ensuring Durability And Compliance With Quality Standards. Auxiliary Helical Spring 2026-03-09
Nepal Upgrading Work Of Phaledi Bhadigaun Kallauro Road K.i.singh-06, Doti 2026-03-09
India Packing Ring Of 26 Mm Thickness For Adjustment Of Buffer Height. .#* Packing Ring Of 26 Mm Thickness For Adjustment Of Buffer Height. Drawing No: Rdsos Sk etch - 97072, Alt. Nil. Matl.& Specn : Rdsos Spec. C-9703 / October 1997. [ Warranty Period: 30 Mo n 2026-03-09
Japan Liquefied Petroleum Gas (for Bulk Tank) 192,000kg 2026-03-09
-Construction-Of-Centrally-Command-Control-Cum-Training-Centre-For-Smart-Water-Management-Under-Wbdwsip,-Phed,-Govt.-Of-West-Bengal,-At-3rd-Floor-Of-Administrative-Building-Within-Wtp-Campus>India -Construction-Of-Centrally-Command-Control-Cum-Training-Centre-For-Smart-Water-Management-Under-Wbdwsip,-Phed,-Govt.-Of-West-Bengal,-At-3rd-Floor-Of-Administrative-Building-Within-Wtp-Campus>Ifb No.-02/se/pmu Of 2025-26
Construction Of Centrally Command Control Cum Training Centre For Smart Water Management Under Wbdwsip, Phed, Govt. Of West Bengal, At 3rd Floor Of Administrative Building Within Wtp Campus
-Construction-Of-Centrally-Command-Control-Cum-Training-Centre-For-Smart-Water-Management-Under-Wbdwsip,-Phed,-Govt.-Of-West-Bengal,-At-3rd-Floor-Of-Administrative-Building-Within-Wtp-Campus>2026-03-09
Whats app