Filter Search


Asia


Location Summary Deadline
-Strengthening-At-Km-55/965-To-56/640-To-(kaduchettipatti-Bypassed-Section),-Km-58/800-To-75/000-(jittandahalli-To-Karagadahalli-Section)-Of-Malur-Hosur-Adhiyamankottai-Road-(sh-17)-(abandoned-Section>India -Strengthening-At-Km-55/965-To-56/640-To-(kaduchettipatti-Bypassed-Section),-Km-58/800-To-75/000-(jittandahalli-To-Karagadahalli-Section)-Of-Malur-Hosur-Adhiyamankottai-Road-(sh-17)-(abandoned-Section>2.mha Road 55/965 To 56/640 And 58/800 To 75/000
Strengthening At Km 55/965 To 56/640 To (kaduchettipatti Bypassed Section), Km 58/800 To 75/000 (jittandahalli To Karagadahalli Section) Of Malur Hosur Adhiyamankottai Road (sh 17) (abandoned Section
-Strengthening-At-Km-55/965-To-56/640-To-(kaduchettipatti-Bypassed-Section),-Km-58/800-To-75/000-(jittandahalli-To-Karagadahalli-Section)-Of-Malur-Hosur-Adhiyamankottai-Road-(sh-17)-(abandoned-Section>2025-10-23
Japan Data Analytics Consulting Services 2025-10-23
India Door Chainless Cotter Bracket For Bcn/bcna Wagons To Rdso .#* Door Chainless Cotter Bracket For Bcn/bcna Wagons To Rdso Drawing No. Wd-90030-s -66 Alt-10, Item No. 13. Material And Specification As Per Drawing. [ Warranty Period: 30 Months Aft er The Date 2025-10-23
India Emergency Window Frame .#* Emergency Window Frame For Emergency Openable Window For Non Ac Coache s Drawing No.:- Icf/std-5-4-005, Alt . (n) Items As Per Col. Iii. [ Warranty Period: 30 Months After The date Of Delivery ] [quantity Tolerance (+/-): 5 %age 2025-10-23
India Set Of Retention Tank For 3-phase Memu/tc Coaches .#* Set Of Retention Tank For 3-phase Memu/tc Coaches As Per Drawing: Dmu/tc/ss -6-3-001 Alt Dr Col-iv Item No. 8 And 9, Note: Safety Clause Must Be Followed According T o Annexure-a Of Dy.cple-ii L.no.rcf 2025-10-23
Japan Novaseq X Series 1.5b Reagent Kit (100 Cycles) Or Equivalent, Type 100, And 24 Other Items 2025-10-23
Japan License For Nature. Com Online Library Databases Or Other Equivalent Databases Via The Internet 1 Set 2025-10-23
Japan The Labour Standards Administration System Update Work For Response To The Establishment Of A New Occupational Accident Reporting System For Sole Proprietors And Others Etc (in 2025 Fiscal Year) 1 Set 2025-10-23
Sri Lanka Repair Of Magnetic Heading Compensator For K-8 Aircraft (foreign Bidders Only) – Limited Internati 2025-10-23
-Strengthening-At-Km-94/0-To-95/0-To-(sogathur-Bypassed-Section),-Km-98/0-To-103/200-(thadangam,-Thookkampatti,-Adhiyamankottai-Bypassed-Section)-Of-Malur---Hosur-Adhiyamankottai-Road-(sh-17)-(abandoned-Sec>India -Strengthening-At-Km-94/0-To-95/0-To-(sogathur-Bypassed-Section),-Km-98/0-To-103/200-(thadangam,-Thookkampatti,-Adhiyamankottai-Bypassed-Section)-Of-Malur---Hosur-Adhiyamankottai-Road-(sh-17)-(abandoned-Sec>1.mha Road 94/0 To 95/0 And 98/0 To 103/200
Strengthening At Km 94/0 To 95/0 To (sogathur Bypassed Section), Km 98/0 To 103/200 (thadangam, Thookkampatti, Adhiyamankottai Bypassed Section) Of Malur - Hosur Adhiyamankottai Road (sh 17) (abandoned Sec
-Strengthening-At-Km-94/0-To-95/0-To-(sogathur-Bypassed-Section),-Km-98/0-To-103/200-(thadangam,-Thookkampatti,-Adhiyamankottai-Bypassed-Section)-Of-Malur---Hosur-Adhiyamankottai-Road-(sh-17)-(abandoned-Sec>2025-10-23
Whats app