Filter Search


Asia


Location Summary Deadline
-As-Per-Boq>India -As-Per-Boq>Special Repairs To Bldg. No P-283/03,04,07 And 08 (04x Or Md Accn) And P-162/01 Married Accn For Key Pers (type-iii Qtr) Under Ge (a) Vadodara.
As Per Boq
-As-Per-Boq>2025-02-01
qty:70
>India
qty:70
>Supply Of Heating Element, Bathroom Mat 4 X 14, Caruberetor For Bukhari, Caruberetor Pipe, Dsc Token, Air Humidifier, Ultrasonic Humidifier
qty:70
qty:70
>2025-02-01
-As-Per-Boq>India -As-Per-Boq>Special Repairs To Bldg No P-133/01 To 04 (04x Or Md Accn) At Sector C Makarpura Under Ge(a) Baroda.
As Per Boq
-As-Per-Boq>2025-02-01
-Electric,bhaban-And-Other>India -Electric,bhaban-And-Other>Suply Electric,bhaban And Other
Electric,bhaban And Other
-Electric,bhaban-And-Other>2025-02-01
India Supply Of Network Video Recorder 64 Channel, Network Video Recorder 32 Channel, Network Video Recorder 8 Channel, Bullet Camera, Dome Camera, Hard Disk, Surge Protector, Poe Switch, Lan Switch, Networking Enclosure 17u, Networking Enclosure 04 U, Rj45 Con 2025-02-01
India Ge(s) Btd 88 Of 2024-25 Special Repair Minor And Lbw Works Under Age Br Ii And Age Em Iv Under Ge(s) Bathinda At Bathinda Mil Stn Job No (81sabtdsr(b)23 2024-25 81sabtdminor032024-25 And 81sabtdlbw122024-25) 2025-02-01
qty:438
>India
qty:438
>Supply Of White Board 4x3 Feet, Fig 11 Tgt Paper, Fig 11 Target Sheet, Bamboo Stick For Fig 11 Target, White Board Duster, Long Pointer Stick, Laser Pointer, Flex 02x10 Mtr
qty:438
qty:438
>2025-02-01
qty:25
>India
qty:25
>Supply Of Bty Dc 7 4v Pack, Charger Assy, Bty Pack L Type, Battery Pack M, Adopter H
qty:25
qty:25
>2025-02-01
India Supply Of Genral Item At Jila Jail Shahdol Distt Shahdol 2025-02-01
-Provision-Of-Three-Phase-Electric-Supply-With-Connected-Internal-E/m-Accessories-At-Ascon-Node-And-Certain-Other-Sanctioned-Works-In-The-Aor-Of-Age-E/m-ii-Under-Ge-865-Ews>India -Provision-Of-Three-Phase-Electric-Supply-With-Connected-Internal-E/m-Accessories-At-Ascon-Node-And-Certain-Other-Sanctioned-Works-In-The-Aor-Of-Age-E/m-ii-Under-Ge-865-Ews>138we/l-117/24-25
Provision Of Three Phase Electric Supply With Connected Internal E/m Accessories At Ascon Node And Certain Other Sanctioned Works In The Aor Of Age E/m-ii Under Ge 865 Ews
-Provision-Of-Three-Phase-Electric-Supply-With-Connected-Internal-E/m-Accessories-At-Ascon-Node-And-Certain-Other-Sanctioned-Works-In-The-Aor-Of-Age-E/m-ii-Under-Ge-865-Ews>2025-02-01
Whats app